Indian Railway main logo
Search :
Increase Font size Normal Font Decrease Font size
   View Content in Hindi
National Emblem of India

About Us

IR Personnel

News & Recruitment

Tenders & Notices

Vendor Information

Public Services

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS

CARRIAGE AND WAGON


Coaching


There are total 1246 BG coaches based on NCR with primary maintenance activities under taken at Allahabad, Kanpur, Agra, Mathura, Agra fort Gwalior, Jhansi and Khajuraho Depots. POH of BG coaches based on NCR is carried out at Alambagh, Jagadhari, Gorakhpur and Ajmer workshops. Besides, 75 NG coaches are also based over JHS division.

Location

ALD

CNB

JHS

GWL

KURJ

AGC

AF

MTJ

Total BG

GWL (NG)

DHO (NG)

Coach Holding

377

197

201

264

5

114

56

32

1246

58

17

Primary Maint. (No. of Trains)

11

8

8

8

1

3

2

2

43

3

1

 Maintenance Practices of coaching stock:


Pest & Rodent control

Contacts for Pest & Rodent control of all major depots (ALD, CNB, JHS, GWL, AGC, AF & MTJ) are presently going on as per guidelines of Railway Board. 

Mechanized cleaning of coaches on Puri pattern

In practice at all major depots – ALD, CNB, JHS, GWL, AGC & AF & MTJ.

Clean Train Station

Contract is going on at ALD (44 trains) and CNB (30 trains)  stations. Contract is under renewal at JHS.

On Board Housekeeping Services (Train No.)

OBHS scheme is running in 10 trains of NCR:-

1.Train no 14113/14 ALD-DDN,    

2.Train no 12033/34 CNB-NDLS

3. Train no 14115/16 ALD-HW,     

4. Train no12547/48 AF-ADI.

5. Train no 14151/52 CNB-ANVT, 

6.Train No 14153/54 CNB-ASR

7.Train No 12175/76 MTJ- HWH

8. Train No 12177/78 GWL-HWH 

9. Train No 11123/24 GWL- BJU  

10. Train No 11107/08 GWL-BSB)

Mechanized Laundry

Setting up of mechanized laundry at GWL (2T) has been sanctioned through departmental route under PH-53 PWP 2014-15. The laundry is planned to be set up by June’15. A 4T Mechanized laundry at ALD is planned to be processed under PH-53 in PWP 2015-16.

Own Your Trains System (OYTS)

As per guidelines of Railway Board, 23 mail /express train of NC Railway are allotted to SAG and JAG officers for monthly inspection in respect of Cleanliness and hygiene and passenger amenities. OYTS Reports of officers are analyzed and sent to divisions for corrective measures.

 

Freight 


Freight Stock Maintenance Activities:

ROH activities of wagons are under taken at GMC, Baad and JHS depot. Requirement of wheels for freight stock of all divisions are met by JHSW.

GMC depot is nominated depot for ROH of BLC, BCN & ERU wagons. Baad depot is nominated depot for ROH of BTPN wagons. JHS ROH depot is primarily nominated for ROH of military stock. Container rakes (BLC wagons) are being examined on CC pattern at ICD GMC, ICD/DER, ICD/KLPL/Panki and ARIL Khurja in Allahabad Division, with BPC valid for 6000 kms/30 days.BTPN wagons are being examined on CC pattern at Baad depot in Agra division with BPC valid for 6000 kms/30 days.

Activity

Location

Average out turn/ month

ROH of BLC Wagons

GMC/ALD Div

66.5

ROH of other than BLC(BCN/EUR) Wagons

GMC/ALD Div

22.1

ROH of BTPN wagons

Baad/AGC Div

70.1

ROH of Air Brake (Military, BOBYN, BCN)wagons

JHS/JHS Div

75.1

 Closed Circuit examination of BLC rakes

ICD/DER

76

ICD/ARIL/Khurja

6

ICD/CPC/GMC

6.2

ICD/KLPL/Panki

4.7

Closed Circuit examination of BTPN  rakes

Baad/AGC Div

19.18

Premium End to End Rake Examination BCN/BOXN wagons

GMC/ALD Div

10.7

JHS/JHS Div.

6.8

Premium End to End Rake Examination of BTPN wagons

Baad/AGC Div

23.3

ORGANISATION STRUCTURE







PERFORMANCE DURING 2014-15

Carriage & Wagon:

i.   Coaching Performance :

SN.

Items

Target 2013-14

Performance    2013-14

Target            2014-15 (up to Jan)

Performance    2014-15             (up to Jan)

1.

Coach detachment

Territorial (Other Rly)

8

2

5

24

Ownership

1

0

0.83

0

2.

Ineffective

AC coaches

10%

6.93%

10%

8.50%

All other coaches

8.5%

5.76%

8.5%

6.87%

3.

Punctuality loss

Total no.

900

602

650

735

4.

IOH

720

758

680

621

4.

Secondary detachments

Territorial

12

1

6.67

0

Ownership

12

0

6.67

0

ii.   Freight Performance :

SN.

Items

Target 2013-14

Performance    2013-14

Target            2014-15  (up to Jan)

Performance    2014-15             (up to Jan)

1.

Wagon detachment

144

139

104.17

141

2.

Train parting

45

22

15.83

31

3.

ROH Outturn

2280

2421

2000

2364

4.

Wagon Ineffective%

4.50%

3.62%

4%

3.39%

5.

Hot Axle

97.92

91

64.17

90

        

iii.Adoption of Bio-toilet technology by NCR: 

            279 coaches with 747 bio-toilets are running successfully over NCR.  Largely based on the success of the pilot project at GWL , Railway Board have decided to proliferate this technology over IR.

iv. Implementation of FMM Project at ICD/Dadri: 

ERP enabled FMM project has successfully been implemented at ICD/Dadri.  Dadri depot received SAP ACE Award in category “Best Run in Innovative Use of SAP” jointly with CRIS.

v.Coach cleaning activity:

Mechanized coach cleaning is going on all major depots i.e. ALD, CNB, JHS, GWL, AGC AF &MTJ,Pest and Rodent Control in coaches, washing pit and depot premises-All the depots covered.CTS Contract is going on at ALD (44 trains) and CNB (30 trains)stations. Contract is under renewal at JHS.

vi. Infrastructure Improvement:

1.  Commissioning of :

·Second washing pit at NCC/CNB and second washing pit at AGC.

·Sick line AGC

·Train examination facility at Baad

·ROH facility at Baad.

   2. Provision of standard Rolling in lights with huts at AF , AGC and Rolling in lights at CNB.

vii.        Improvement in maintenance practices:

a)To reduce train parting cases due to uncoupling, a JPO has been issued vide this office L No. HQ/NCR/Mech/820-I,dated:12.07.2012. In addition to above following action has also been taken:-

§100% testing of knuckle by DPT during ROH.

§100% gauging of CBC component in ROH.

§100% testing of operating handle on fixture in ROH.

b)To avoid hitting cases of wagon doors during run, proper closing and securing of wagon doors at loading/unloading points over NCR is being ensured.

c)To minimize brake binding cases, following action has been taken:-

·Provision of air dryer with all compressors installed at all C&W depots.

·Ensuring Piston stroke, DV functionality and draining of AR during Primary Maintenance.

·Thorough RTR testing of rakes.

d)Sensitization of crew, station staff for manual releasing of brakes at the time of traction change/loco reversal and attachment/detachment of coach/wagons.




Source : North Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 04-11-2015  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.