(upte on 16-02-2017)

ELECTRICAL GENERAL SERVICE

A)GENERAL INTRODUCTION –

1.1.1Gazzetted officers -Sr. DEE/G/JHS, ADEE/G/JHS and ADEE (G) GWL

1.1.2Staff non Gazzetted.

S.N.

Category

OSM group

TL/AC group

S/S

O/R

S/S

O/R

1

Supervisors

26

22

14

13

2

Skilled

136

87

157

104

3

Un-skilled

188

176

107

89

Total

350

285

278

206

1.2Electrified station:

Electrified/Non-electrified

Main line

Branch line

NG line

Total

Electrified stations

36

84

17

138

Non-electrified stations

02*

14

10

26

Total no of stations

38

98

27

164

*SMTL & NUB

1.3Power Supply system:

Sub-stations

45

Transformers

76

Stationary DG sets

28

5 KVA DG sets

56

1.4Staff Quarters:

Electrified staff quarters

4935

1.5Electric pumps:

S. N.

Type of pump

Qty

1

Vertical turbine pumps

04

2

Submersible pumps

124

3

Centrifugal pumps

22

4

Mono block pumps

27

5

Jet pumps

01

6

Sewage Pump

02

Total

180

1.6Water Coolers:

S. N.

Water coolers

Qty

1

On platform

103

2

Offices & Others places

103

Total

206

1.7MAINTENANCE DEPOTS (PS):

Major maintenance depots for PS:06 (JHS/East, JHS/West, JHS/ DSL shed,

GWL, ORAI & BNDA)

Minor maintenance depots for PS: 05 (LAR, JUHI, CKTD, MKP & KURJ)

1.8Train lighting & Air conditioning Assets:

Rakes for Primary maintenance: 38 (BG/33 & NG/05)

AC coaches :51 (JHS/10, KURJ/02 & GWL/39)

Battery charging sets:31 (JHS/13, KURJ/3, BNDA/01, MKP/02,

GWL/11 & GWL-NG/01)

Pre-cooling points:252 (JHS/132, BAB/12, KURJ/20, MKP/08,

GWL/92)

MAINTENANCE DEPOTS (TL-AC):

Major maintenance depots for ETL:02 (JHS& GWL)

Minor maintenance depots for ETL:03 (MKP, BNDA & KURJ)


HIGHLIGHT OF ELECTRICAL GENERAL DEPARTMENT (APR-16 to JAN-17 )

1

Escalator work has been started on PF No.3 at Jhansi station

2

DAA & DBA station have been converted into LED station completely.

3

500 KVA DG set has been installed & commissioned at substation no.1 at GWL station as standby power supply arragement.

4

LC gate no.351 between BZY-BPW and 407 of Antari station yard has been electrified through normal electric supply.

5

LC Gate no.134 between JHS-CGN section has been electrified through solar system.

6

Paman Railway station has been connected by solar supply as standby power supply arrangement.

7

Electrical work of Electronic in-motion weigh bridge on second loop at KID station has been completed.

8

01 no. 400 ltrs. Capacities water cooler has been installed & commissioned at PF No.6 at JHS station.

9

11 nos.150 ltrs.old water coolers have been replaced by new one at 02 nos.MRA (PF No.1 & PF No.2),04 nos.GWL (PF No.1,PF No.2,near parcel office & up PRS),03 nos. at MKP (PF No.2,3 & 4) 01 no.at MBA (PF No.1) and 01 no. at CKTD (PF No.1) for reliability of cold drinking water to passengers.

10

05 nos.400 ltrs. Capacities water cooler have been installed & commissioned at PF No.1 at GWL (04 Nos.) and PF No.1 at BIX station (01 No.) in place of 150ltrs old water coolers.

11

03 nos. water coolers of PF no.4/5 of Jhansi station have been connected with DG supply as standby power supply arrangement.

12

155 nos.45 watts LED light fittings have been provided in place of CFL/HPSV/MH lamps at DAA (41Nos.),DBA (41 Nos.), Banda (30 Nos.),GWL (25 Nos.) & MKP station (18 Nos.) as energy conservation measures.

13

105 nos.18 watts LED tube light fittings have been provided in place of T-5 fittings at DAA (68Nos.), DBA (11 Nos.), PTSC (08 Nos.) , Parichha station (10 Nos.) & 02 Nos,. at each station at KRQ,KTRA,SOR,MSVas energy conservation measures.

14

09 nos.30 watts LED beam light fittings have been provided in façade lighting of station building JHS in place of 250 watt HPSV fittings as energy conservation measures.

15

08 nos.40 watts LED pendent light fittings have been provided in concourse of VIP gate at JHS station in place of 85 watt CFLs as energy conservation measures.

16

32 nos.24 watts LED light fittings have been provided at MKP station (18 Nos.) BAO station (08 Nos.) & PMN station (06 Nos.) in place of CFL/HPSV/MH fittings as energy conservation measures.

17

02 nos.200 watts LED beam light fittings have been provided in place of 250 watt HPSV lamps at high mast tower of Banda end & circulating area at MBA station as energy conservation measures.

18

02 nos.200 watts LED light fittings have been provided in east circulating area near VIP gate & RPF thana at GWL station in place of 250 watt MH fittings as energy conservation measures.

19

03 nos.150 watts LED street light fittings have been provided in place of 250 watt HPSV lamps at high mast tower of circulating area, Banda station as energy conservation measures.

20

03 nos.100 watts LED light fittings have been provided in place of 250 watts MH fittings at LSR and HSR section in diesel shed, Jhansi as energy conservation measures.

21

03 nos.50 watts LED light fittings have been provided in newly constructed shed near escalator`s stairs at PF No.1 (02 nos.) and PF no.4/5 (01 no.) at JHS station.

22

53 nos.30 watts LED street light have been provided at CKTD (19 Nos.), MKP (01 No.), RRU (15 Nos.) & GWL station (18 Nos.) in place of CFL/ MH fittings as energy conservation measures.

23

17 nos.2 x 22 wattsLED tube light fittings have been provided in place of T-5 (2x28 watt) fittings at DRM cell (11Nos.),DEE/TRO chamber (03 Nos.),Rly.hospital,JHS (02 Nos.) & control office,JHS (01 No.) as energy conservation measures.

24

08 nos.60 watts LED light fittings have been provided in place of 85 watts CFL at JHS station as energy conservation measures.

25

15 nos.60 watts LED light fittings have been kept in ART of Jhansi station.

26

103 nos.20 watts LED tube light fittings have been provided in COP in place of T-5 fittings at ATE (16 Nos.), BTX (10 Nos.), HPP (12 Nos.),BLNR ( 04Nos.), RRU (08 Nos.),DAA (05 Nos.),SOR (04 Nos.), DBA (06 Nos.) & MBA station (38 Nos.) as energy conservation measures.

27

07 nos.timer switches have been provided in high mast towers of east & west side at GWL station.

28

Substation no.13 nearby railway station, Jhansi has been dismantled due to construction of yatric shelter.

29

Electrification work of Ohan cabin and IOW office at MBA station has been completed.

30

Rs.90.43 lakh has been recovered from outsider/vendors/Govt.deptt.during current financial year.




Source : North Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 16-02-2017  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.