ELECTRICAL (RS)

            GENERAL 

  1. Electric Loco Shed, Jhansi designed for holding of 100 locos was established in 1987 with an initial holding of 17 locos.  Present holding of the shed is 207 locomotives viz. 90 WAG/7 (45 BHEL & 45 CLW make) and 117 WAG/5 (74 BHEL & 43 CLW make). The newly received WAG-7 locomotives from BHEL and CLW are having some special features i.e. Crew Friendly Cab with FRP  Driver Desk and Air conditioning, VCD & Stick type Master Controller.

ELS/JHS is the first shed in Indian Railways to acquire three prestigious International Standards viz., ISO-14001:2004, OHSAS-18001 & ISO-9001:2008 together.

  1. ORGANISATION & ASSETS

2.1GAZETTED :

a. Sr.DEE/RS- Shri A.K.Shrivastava

b. DDEE/RS-Vacant

c. ADEE/RS-Sh. R.D.Bhargav

d. ADEE/RS- Sh. A.K.Saini

e. SMM/ELS-Sh. S.K.Singh

2.2      NON-GAZETTED:

Sr. No.

Category

ELS/JHS

SS

MOR

1.

2.

3.

4.

Supervisors

Artisan

Unskilled

Supporting

82

590

53

22

  66

443

93

 18

TOTAL

747

620

2.3      ASSETS:- Total No. of Locos = 207

Sr. No.

Type of Loco

Nos. of Loco

Manufactured by

Type of  Braking

BHEL

CLW

Air Brake

01.

WAG-5

117

74

43

117

02.

WAG-7

90

45

45

  90

Total

207

119

88

207

2.4      SIV :

Total  97 Nos. ( 71 WAG-7+ 26 WAG-5) Locos are fitted with Static Converter.

Make of SIV

SIEMENS

AAL

Hirect

Medha

ABB

TOTAL

Single Cubicle

39

-

25

06

14

84

Generic Version

-

13

-

-

-

13

Total

39

13

25

06

14

97

2.5     MPCS :

Total 107 locos are fitted with Micro Processor Based with Fault Diagnostic system.

(38 Nos -M/s Stesalit make +62 Nos -M/s Medha make +05 Nos -M/s IC Elect. make +02 Nos -M/s Stone India make)

2.6    Vigilance Control Device ( VCD).

All  207 Nos locos are equipped with VCD at present.(21 Nos. of M/s Saitronik make + 103 Nos. M/s Medha make + 43 M/s Stesalit  make +28 Nos M/s AAL make + 08 M/s IC Elect. Make.)+ 04 VCD In built in MPCS Ver-3.

3.0   PERFORMANCE OF IMPORTANT INDICES

Twin objectives of the Shed viz., “Availability” & “Reliability” of locomotives have been very well achieved by ELS/JHS.

Performance of the shed on all the importance indices e.g, “Loco Failure”, “Punctuality Loss”, “Outage”, “Cost of Maintenance” & “Infrastructural & System Improvements” has not only shown considerable improvement over the last year but has been BEST-EVER during the last 30 years since inception of the shed which is evident from the enclosed tables.


Sr No

Performance

Target 17-18

Prop. Target  upto Jan’ 18

Actual upto Jan’ 17

Achievement upto Jan’ 18

Percentage
(+) Improvement
(-) Deterioration

Compared to Last Year

Compared to Target

1

Punctuality Loss Cases (Rly. Board) /100 Loco. On Loco A/c.

-

-

10.14

11.59

-14.30%

-

2

Loco Failures(F) /100 Loco

26.1

21.75

12.56

14.49

-15.37%

+33.38%

3

Loco Failures (F+W+I) (Failure + Withdrawal + Irregularity)/100 locos.

44.5

37.01

32.37

27.54

+ 24.19%

+25.58%

4

Statistical Ineffective (%)

5.6

5.6

5.99

5.70

+4.84%

+43.00

5

Net Goods Outage (in locos).

167.7

167.7

188.30

189.57

+0.67%

+13.04%

6

 Net Goods Outage (in%).

81.01

81.01

90.96

91.58

+0.67%

+13.04%

7

Unschedule Visits/ Month /100 loco.

11

11

7.25

6.18

+14.76%

+43.82%

8

Unschedule Heavy Lifting / Month /100 loco.

7.1

7.1

3.77

3.04

+19.36%

+57.18%


4.0       MILESTONES ACHIEVED:

4.1       BEST ELECTRIC LOCO SHED SHIELD OF NCR :

ELS/JHS has been awarded with the Shield of “Best Electric Loco Shed of NCR” consecutively for three years viz., 2003-04, 2004-05, 2005-06, 2008-09, 2010-11 & 2016-17 and jointly in the year 2006-07, 2009-10 & 2014-15 along with ELS/CNB.

4.2       ELS/JHS IS THE ‘FIRST ELECTRIC LOCO SHED IN INDIAN RAILWAYS’ TO ACQUIRE 3 PRESTIGIOUS CERTIFICATIONS VIZ., ISO-14001, OHSAS-18001 & ISO-9001 CERTIFICATIONS:

Railways Corporate Objectives of resource conservation, pollution control, occupational health of staff and high safety standards in shed’s working with built in continual improvement can be effectively and best addressed by ISO-14001 & OHSAS-18001 (Occupational Health & Safety Assessment Series).ELS/JHS is the first Electric Loco Shed in Indian Railways to acquire both these prestigious certifications – without any consultancy contract –a milestone.

Besides above, ISO-9001 Certification has also been acquired by the Shed which has lead to qualitative improvement in reliability, availability and overall improvement in efficiency on sustained basis. Thus, ELS/JHS has become the first Electric Loco Shed on Indian Railways to acquire all the three prestigious certifications viz.,ISO-9001, ISO-14001 & OHSAS-18001.

4.3       EVER HIGHEST AVAILABILITY (OUTAGE) :

Availability (Outage) of shed has been Best Ever during 2016-17 since inception of the shed.  Goods Loco Outage has been consistently well above the target throughout the last year (+20.86).  In the current year 2017-18 upto Jan2018  it is again (+21.87) well above the target.

A record outage of 199.3 loco has been achieved on 9th April 15. This is the highest ever outage in the history of the shed.  

4.4      FORMATION OF MULTIPLE UNITS :  

            57 Multiple units of JHS based locomotives were in working  on line  in the month of Aug’16 , which is highest ever figure of ELS/JHS. Which is height ever in the history of this shed.

4.5        MAN  OF  THE  MONTH  AWARD

To motivate the staff ,”Man of the month” award started in the ELS/JHS from the month Aug’2014 for excellent work done during the whole month.

5.0      SOME OF THE BEST INNOVATIONS DONE BY ELS/JHS :

5.1 Development  of   HV testing facility to arrest the failure of VCB insulator busting on line.

5.2Development  of  VCD test bench for testing of all makes of VCDs(Ver-5).

5.3Development of Test bench for testing of multi-couplers which saves considerable time in testing while forming Multiple Units.

5.4Armature wooden Fixture has been developed in house for avoiding load transfer of Armature  at V cone & PE  side evolutes during Armature lifting. 

5.5Development of  table (size 253x130x90 cm) for cleaning of Axle Box . In this modified  table dust & dirt will be collected on one place.

5.6Development  of tray for cleaning of  Bogie Equipments.

5.7Development of Scrapper for cleaning of Bull Gear Teeth for removing of cardium

compound.

5.8New integrated test bench for testing of both Bombardier & AAL make SMGRs.

5.9Test Bench for Focus Adjustment of Twin Beam Headlight.

5.10     Test Bench for testing Master Controller, EMC, Time Lag relays, Flexible Hose Pipes,

            VCD (M/s Saitronik make) etc.

5.11Provision of Fuse Board Assembly on top of battery charger of AC electric loco and removal of MCB.

5.12Air Dryer Test Bench developed for testing of Air Dryers after overhauling.

5.13Jig developed to fit the bearing on rotor shaft so that uniform pressure on inner & outer racer  of bearing is ensured.  

5.14Fixture has been developed by shed on own effort for assembly and dis-assembly of brake cylinder. This has reduced the efforts in doing overhauling work.

5.15Provision of MVSI in place of SIV (AAL make) cooling fan in Loco no. 27944 WAG-7 for improving the performance of SIV.

5.16Provision of conventional battery charger out side the SIV Siemens make in loco no. 27946.

5.17A  modification have been carried out in the baking oven to reduce its inside volume  by  suitably fixing MS sheet inside the oven. It has reduced energy consumption by 20% .

5.19     COMMISSIONING  OF MPCS VER. 3 IN LOCO NO 28658 WAG-7 :

            M/s Medha make MPCS Ver. 3 has been commissioned on Loco No. 28658 WAG-7 by in house efforts of ELS/JHS. Major work carried out was:

a)Provision of Hall effect sensors for measurement of Traction Motor current.

b)Provision of BP & BC pressure sensors (Based on Piezo Electronic principal) of Tri-plate pneumatic panel.

c)Provision of Notch Encoder (Non contact type) on SMGR.

d)Provision of driver display unit on driver desk with 10.4” LCD TFT display.

e)Provision of Antenna on Loco roof for real time monitoring of loco using GSM,CDMA &

     GPS.

f)About 500meter long wiring laid down for commissioning of above Version-3 MPCS.

MPCS Ver-3 has some special features like built in VCD , GPS navigation,  remote analysis, fault recording in MPCS, 10.4“  LCD TFT driver display, digital input increased from 128 to 144 , Measurement of locomotive speed, inbuilt Energy metering, direct display of SEC and Push button to reset the MPCS if required. 

5.20    JIG  FOR PROVISION OF PTEF  SLEEVE ON  I –LET ROD OF PANTOGRAPH  :-

           

Originally there was no provision of PTFE sleeve on  i-let rod of pantograph leading to  flashing. To avoid such cases, PTFE sleeve is being  provided.

            Earlier the sleeve was provided by hammering leading t o breakage of i-let rod insulator. With this JIG the pressure exerted will be smooth and uniform and insulator of i-let rod will not get cracked.

5.21     Stand cum - trolley for handling  DJ  has been developed by shed to carry  DJ from loco to shop floor and  vice- versa. A wheel with latching  arrangement has been provided  to hold DJ in desired position during  overhauling.

5.22     Stand for Pantograph i-let rod with insulator of AM-12  PT has been developed in-house for stacking.                                   

This Stand can accommodate 16 Nos Pantograph I-LET Rod Assly at a time and insulator of I-LET Rod will be kept safely on cushions provided over the base rod of the stand.

5.23     Replacement of unreliable Old version -1 M/s Saitronik make VCD by version -5 VCD

            has been carried out. 15 locos completed out of 28 locos.

5.24     Remote operated auto cut out mechanism added for oil topping up in GR to avoid spillage

            of oil during topping up. 

5.25     Limit switch provided in door of armature heating oven to avoid wastage of energy.

5.26    Temperature strip being provided on TFP conservator for monitoring   Highest  Temperature

           attained on line between two schedule.

6.0       INFRASTRUCTURAL IMPROVEMENTS DONE BY ELS/JHS:

a)   Augmentation of ELS/JHS from 120 Locos to 150 Locos:

vWork sanctioned in Pink Book 251/07-08,(588/16-17, 627/17-18).

vTotal Cost – Rs 8.37 Crores. (5.73 Crores Engineering +2.64 Crores Electrical).

vExpenditure upto Jan’18 – Rs 8.26 Crores.

vCivil work completed. 99% Physical work has been completed .  

vFund allotment in 2017-18                           – Rs 0.85 Cr.

vFund required  in  2017-18                           – Rs  0.15 Cr.

b)            Augmentation from 150 Locos to 175 Locos:

vWork sanctioned in Pink Book 427/09-10 (593/16-17, 632/17-18).

vTotal Cost – 11.15 Crores. (6.66 Engineering & 4.48 Electrical)                   Expenditure upto Jan’18.                                        –   Rs 8.00 Crores.

vCivil Engineering 90% track work completed. Electrical  and OHE work 90% completed.  Pit work 90% completed.

vFund allotment in 2017-18                           – Rs. 2.50 Cr.

vFunds required ( EBR–IF) for 2017-18        – Rs  2.70 Cr.

c)            Stacking Arrangements for Improving House Keeping: Various double storied stacking arrangements have been made by totally in-house efforts resulting in excellent storage facilities of equipments and utilization of precious crane space.

d)            Arrangement of PCB Digital Cards Storage System: A new storage arrangement for PCB cards / Electronic Items of Static Converters of M/s AAL and M/s Siemens make and Microprocessor of M/s Medha & M/s Stesalit make has been provided in the Electronics section of the shed. This has facilitated easy and quick identification of items and their safe storage as lot of cards are being procured for these equipments.

e)           Modification & Mechanical improvement in EOT Cranes :

In EOT carne  no. 406 there was a misalignment of main hoist gear leading to uneven meshing and resultant  non-uniform loading of main gear. It was minutely analyzed and found that the axis of main gear was not parallel with base. Proper meshing & fitment of main hoist gear was done.    

f)            Provision of 500 KVA DG Set:  500 KVA DG Set has been commissioned in 2009 under Phase-I Shed Expansion Programme.  It has helped in interrupted working of the shed in case of power supply failure.

g)            Filter Cleaning Plant: In order to improve the work areas so that the staff is protected from dusty environment, filter cleaning facility has been developed by in-house efforts.

h)            Replacement of Old LT Distribution Panel by New Panels for M&Ps of the shed:   Replacement of old LT electric distributions panels at 6 locations in various sections in the shed by LT Panel with Triple Pole MCCBs has been done for improvement in lighting circuit & power supply to M&Ps.

i)             Automatic Power factor correction panel: Automatic power factor correction panel of 498 KVAR make ACM Switch Gear, Kanpur has been commissioned. It has reduced the line loses & loses due to inductive load and improved the

efficiency of input power supply - A step towards energy conservation by saving about 8% energy.

j)             New Speedometer Test Bench has been commissioned in TR-III section for testing of all types of Speedometers on a single test bench.

k)            A ferrous wear debris monitor has been commissioned in Lab for easy and accurate analysis of axle box grease for any ferrous content.  The machine has helped in detecting the failures at very initial stage.

l)            A Universal Multipurpose Armature Machine of M/s HYT Machines Pvt. Ltd., Pune procured through M&P has been commissioned. On this machine, armature commutator turning, mica under cutting, buffing and measurement of segment to segment voltage drop tests are being done.

m)           Provision of Epoxy Flooring in 4 Sections:  Epoxy Flooring has been done in Pneumatic, TR-I, TR-II  & TR-III Sections of ELS/JHS. This has given aesthetic look to these sections and has helped in better cleanliness of the sections, avoiding dirt and dust in the equipments under overhauling. Epoxy Flooring  for other areas/ sections also planned.!in 13 locos.

n)           Air Compressor (KES-90) Rotary Electrical Driven (Screw type), 500 CFM, 10KG/Cm2:

Air Compressor  ( KES-90) Rotary Electrical Driven (Screw type), 500 CFM, 10KG/Cm2 of M/s Kirlosker Pneumatic Co. Ltd,  Pune has been commissioned  against M&P item. This system has air dryer in the circuit to supply moisture free compressed air which is used to clean pneumatic valves, loco body filters and cleaning of other equipments  like, RSI etc.

o)            Provision of High Reach Pantograph :

18 Nos High Reach Pantograph have been commissioned  in WAG-7 locos. 

            p)           Modification in MPH testing Panel :

            A modification has been carried out in the MPH testing panel to test QPH along with working of MPH similar to system of the locomotive.

q)        An arrangement has been made to regulate the discharge of MPH to ensure correct  setting of QPH. For the verification of the oil pressure an analog air pressure gauge has also  been connected with the pipe line. Previously setting of QPH was being done on air pressure.

r)           TURBO VENTS

62 Nos. Turbo vents has been provided on the Roof in heavy bay for easy escape of fumes & smoke and to keep the shop floor ventilated and comfortable by circulating fresh air. As these Turbo vents are operated by wind. There is no electrical power consumption and it is maintenance free. 

s)            fo|qr yksdks “ksM] >kalh esa gfjr igy ds vUrZxr fd;s x;s dk;Z¼tSls 62 u0mtkZ jfgr VoksZosUV dk izkfo/kku]osgrj fgfVax O;oLFkk dq”ky izdk”k O;oLFkk½          o mlls dh xbZ cpr dk cksMZ “ksM ds eq[; }kj ij yxk;k x;k gSA

Assistance Required

 

  1. Loco holding of the shed has increased to 207 while the staff sanction available is for 175 locos only.  A proposal for creation of 154 revenue posts for Electric Loco Shed, Jhansi against Railway Board vacancy bank duly concurred by HQ Finance and approved by the GM for approaching Railway Board to provide money value `4,87,39,380/- (annually) from Railway Board’s staff vacancy bank has been sent to Railway Board vide GM(P)NCR letter No. 797-E/Cre/154-Posts/TRS/JHS/Elect/JHS/D-136 dt. 13.04.2012. Railway Board may be requested to provide required money value amounting `4,87,39,380/- from Railway Board’s vacancy bank along with their sanction, so that 154 posts may be created for Electric Loco Shed, Jhansi.  In this regard, reminders have been sent by HQrs to Board on 14-07-15 and 07-04-16.  Query raised by Railway Board has been replied vide NCR/HQrs L.No.797-E/Cre/P-154/TRS-JHS/Elect/D-136, dt. 08-03-17.  A proposal for 37 posts out of 154 posts against surrender of 30 posts (surrender value of `1,75,68,792/-) has been sent to NCR/HQrs  for  early  creation  of  posts,  vide this office L.No. JHS/RS/P-5/Cadre, dt. 16-05-16 for approval of FA&CAO.

Another proposal for creation of 196 posts (as per 207 holding) has been sent to HQ vide DRM(P)/JHS’s letter no. P/123/creation of 196 posts/TRS Deptt./cadre, dt. 21-06-17 for vetting by HQrs Finance and GM’s sanction through PHOD.  Money value for creation of these posts will be taken from Rly.Board vacancy bank.

Loco holding of the Shed has reached 207 and sufficient staff are not available as a result proper maintenance of locos is suffering.

2.Use of cast iron Brake Block inplace of “L” type composite brake block:- ‘L’ type  composite brake block is being used in loco as per RDSO’s letter no.EL/3.2.19/5 dt. 27.01.15  and BC pressure has been reduced from 1.8 Kg/cm2 to 1.4 Kg/cm2 in all  locos. Inspite of this, wheel widening case is occurring regularly. Necessary guidance to arrest this problem be given to Shed.

3.Proposal for condemnation of Loco no.20601 WAM-4 was sent to HQrs for administrative approval, vide this office letter no. JHS/RS/T-74/AKS dt. 28.11.14. Commissioning date of the loco was 13.07.76 (at CNB), loco has completed 41 years. It is requested to grant the approval for condemnation in terms of Rly. Bd’s letter no. 2016//M(L)/466/19/1 Policy dt. 17.03.17.  




Source : North Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 19-02-2018  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.