Update on 01-11-2016

ENGINEERING

SALIENT FEATURES OF JHANSI DIVISION

As on 01.04.16

Sr.
No.

Item

A'
Route

 'B'
Route

D'
Route
(BG)

E'
Route
(BG)

Total
B.G.

N.G.
Route

Grand Total

1

Route Kilometres :

 

312.000

91.300

688.022

198.561

1289.883

199.800

1489.683

2

Running Kilometres

 

631.540

182.600

696.322

198.561

1709.023

199.800

1908.823

a

Rail Section wise :

60 Kg

629.763

139.270

89.641

119.711

978.385

0

978.385

 

 

52 Kg/90 UTS

1.777

43.330

605.260

78.625

728.992

0

728.992

 

 

52 Kg/72 UTS

0

0.000

1.421

0.225

1.646

0

1.646

 

 

90 Lbs

0

0

0

0

0.000

0.230

0.230

 

 

Others

0

0

0

0

0

199.570

199.570

 

 

Total

631.540

182.600

696.322

198.561

1709.023

199.800

1908.823

b

Sleeper wise :

PSC-6

624.871

168.180

518.947

182.302

1494.300

0

1494.300

 

 

PSC-5

0.615

14.420

171.565

14.290

200.890

0

200.890

 

 

ST

0

0

0

0.160

0.160

182.492

182.652

 

 

CST-9

0

0

0

0.011

0.011

10.919

10.930

 

 

Wooden

0

0

0

0

0.000

6.389

6.389

 

 

Others/Channel

6.054

0

5.810

1.798

13.662

0

13.662

 

 

Total

631.540

182.600

696.322

198.561

1709.023

199.800

1908.823

c

LWR/SWR wise

LWR

582.689

168.375

662.678

152.445

1566.187

0

1566.187

 

 

SWR

43.938

14.225

29.039

44.400

131.602

79.250

210.852

 

 

F.P

4.913

0

4.605

1.716

11.234

120.550

131.784

 

 

Total

631.540

182.600

696.322

198.561

1709.023

199.800

1908.823

3

INFRASTRUCTURE:

 

 

 

 

 

 

a

LEVEL XINGs :

Spl. Class

14

0

0

0

14

0

14

 

 

A' Class                 

11

0

13

0

24

0

24

 

 

B' Class

8

8

32

1

49

14

63

 

 

B1

2

0

0

0

2

0

2

 

 

C' Class

77

13

212

12

314

27

341

 

 

C' Class unmanned

0

0

48

34

82

137

219

 

 

D' Class

0

1

2

0

3

0

3

 

 

Canal Crossings

0

2

6

1

9

4

13

 

 

 

112

24

313

48

497

182

679

b

BRIDGES :

Imp. Bridges

8

4

7

3

22

0

22

 

 

Major Bridges

83

4

74

21

182

25

207

 

 

Minor Bridges

703

132

824

286

1945

307

2252

 

 

Total

794

140

905

310

2149

332

2481

 

 

FOB

21

5

10

1

37

0

37

 

 

ROB

10

1

14

6

31

0

31

c

TURN OUTs :

Total no. on running lines:

 

 

 

 

 

 

 

Shatabdi Route

598

0

0

0

598

0

598

 

 

Other Routes

0

158

443

66

667

85

752

 

 

Total

598

158

443

66

1265

85

1350

d

CURVES :

Curves upto 2º

202

44

148

27

421

25

446

 

 

Curves more than 2º

59

1

24

11

95

94

189

 

 

Total

261

45

172

38

516

119

635

e

TUNNELS :

ARI - SLV

0.366

 

 

 

 

0.366 kms

4

ITKMs

ITKM - Works

 

 

 

 

 

 

3837.502

 

 

ITKM - P.Way

1949.359

393.458

1175.145

110.764

3628.726

197.316

3101.108

 

 

Grand Total ITKMs 

 

 

 

 

 

6938.610

5

BUILDINGS :

 Total Area of

 

 

 

 

 

 

 

 

   Residential buildings:

406413.706 sq.m.

 

   Service buildings :

483543.090 sq.m.

 

Total no.of Residential Qtrs.

5658 Nos.

ORGANISATION

GAZETTED

Sr.DEN/Co. JHS is the head of Engineering Organization who is assisted by 01 JA Grade officer and 05 Senior Scale officers. There are 7 Sub-divisions which are headed by ADENs.

Sr.DEN/
DEN

DEN / ADEN

SSE/SE/P.way  Incharge

HQ

 Jurisdiction & ETKM

Sr.DEN/C
 JHS

LAR

LAR/S

977.00-1037.00= 60.00

 

 

983.17-990.316 = 7.146  (AGD-Malkhedi)

 

LAR/N

1037.00-1095.00= 58.00

 

 

1038.26-1102.51 = 64.65 (LAR-TKMG))

 

JHS/S

1095.00-1127.00= 32.00

JHS/L

JHS/YD

1127.00-1129.00= 2.00  (ML)

 

 

1128.00 - 1129.00 = 1.00 (BL -JHS-CNB)

 

 

1127.600 - 1129.00 = 1.40 (BL - JHS-MKP)

 

JHS/N

1129.00-1172.45= 43.45 

 

DBA

1172.45-1215.60= 43.15

Sr.DEN/N
JHS

GWL

GWL/W

1215.60-1228.285= 12.685 (ML)                                                                                                                                  
1224.830-1262.000=  37.17 (GWL-SOE) (NG)                                                      

 

 

1318.400 - 1319.150  (GWL-PNHR)

 

GWL/E

1228.400 - 1307.435= 79.035 (BL) BLNR-BIX

 

 

1307.435 - 1341.500= 34.065 (BIX-ETW)

 

JPO

1262.00-1350.00= 88.00 (NG)

 

SOE

1350.00-1424.63= 74.63 (NG)

 

GWL/ML

1228.285-1261.00= 32.715

 

MRA

1261.00-1289.00= 28.00

DEN/line
 JHS

CNB

CGN

1129.00-1204.00= -75.00

 

OR

1204.00-1272.00= 68.00   + (13 Kms.)                                                                                       

 

 

AIT - KONCH = 1217.00 - 1230.540

 

JUHI

1272.00-1341.00= 72.00

 

GTM

1347.00-1426.50= 79.50 (BZM-BNDA)                                 

DEN/HQ.

JHS/HQ

JHS

No track length , only Settlement area.

DEN/E
 JHS

MBA

MRPR

1129.00-1210.00= 81.00

 

MBA

1210.00-1283.00= 73.00

 

 

1265.00-1330= 65.00 (MBA-KURJ)

 

BNDA

1283.00-1320.00= 37.00  (JHS-MKP)

 

 

1308.47-1347.00= 38.53  (BZM-BNDA)

CKTD

CKTD

1320.00-1392.00= 72.00

 

MKP

1392.00-1418.100= 26.100  (JHS-MKP) 
1254.700  - 1256.00 (STA-MKP)

 

 

1257.05-1258.90=1.85   (BNPR-OHAN)

 

 

1256.00-1286.00 =30.00 (MKP-ALD)

 

 

1254.700-1256.000 (STA-MKP)

 

SRJ

1286.00-1317.00 =  31.00 (MKP-ALD)

 

NYN

1317.00 - 1346.000 = 29.00 (MKP-ALD)

            NON GAZETTED

            (Only Safety Category)

Category

Total Sanctioned Strength

Staff on Roll

Vacancies

PB – II

384

271

113

PB – I 

6421

5263

1158

Total

6805

5534

1271

EXECUTIVE SUMMARY OF PERFORMANCE 

UPTO SEPTEMBER 2016

 

 

 

 

 

 

Sr. No

Items

Actuals

Target
2016-17

Current Month

Cumulative Upto SEPTEMBER

2014-
2015

2015-
2016

Sep-

15

Sep-

16

% VAR

2015-
2016

2016-
2017

%
VAR

Upto
month

Total

2
(a)

Economy
Scrap Disposal (MT)

13639.54

10188.06

2800

7000

176.28

44.65

-74.67%

3695.99

5188.30

40.38%

5
(a)

Asset Reliability
Rail/Weld Fracture (Nos.)

60

49

 

 

0

3

 

9

7

-22.22%

6
(a) 

System Out put
Rail Renewal (Km.)       (P)

112.09

55.189

36.00

90.00

6.46

7.00

8.36%

28.33

42.00

48.26%

Rail Renewal (Km.)       (S)

22.4

17.839

6.00

15.00

2.81

1.29

-54.09%

6.88

2.20

-68.08%

Total Rail Renewal (Km.)           

134.49

73.03

42.00

105.00

9.27

8.29

-10.57%

35.21

44.20

25.53%

6
(b)

Sleeper Renewal (Km.) (P)

8.58

2.52

7.20

18.00

0.10

1.36

1260.00%

1.24

3.89

213.31%

Sleeper Renewal (Km.) (S)

11.42

4.74

4.80

12.00

0.70

0.00

-100.00%

2.86

5.14

79.58%

Total Sleeper Renewal     (Km.)                      

20.00

7.26

12.00

30.00

0.80

1.36

70%

4.10

9.02

120.02%

6
(c)

Procurement of ballast   (Th.cu.m.)

216.37

222.66

70.00

175.00

20.21

6.51

-67.81%

88.32

72.80

-17.57%

Output of Engg. Machines

 

 

 

 

 

 

 

 

 

6
(d)

Board’s target of tamping (Kms )

2480.25

3134.83

638.00

1595.00

271.16

251.91

 

1447.56

1348.02

 

Output of Machine in Kms

2102.09

2463.23

 

212.86

183.85

-13.63%

1139.45

949.97

-16.63%

5

0

0 T/O

0 T/O

 

0 T/O

0 T/O

 

Output of Kms. as %age of Bd’s Target

84.75%

78.58%

 

78.50%

72.98%

 

78.72%

70.47%

 

6
(e)

Board’s target of T/Outs tamping (Nos.)

1329

1288

540

1350

128

111

 

583

651

 

Output of Machine in T/Outs

1464

1366

 

126

126

0.00%

615

650

5.69%

Output of T/Outs as %age of Bd's Target

110.16%

106.06%

 

98.44%

113.51%

 

105.49%

99.85%

 

PERMANENT WAY

The Division has 1489.683 Route kms. on A, B, D, E & NG lines with 1908.823 kms. of track. (Excluding Yard/Loop lines)

           

Category

Route (kms.)

Track Running (kms.)

(a)

Mainline  

(‘A’ Route)

   BIN-AGC Section

312.000

631.540

(b)

(‘B’ Route)

   MKP-NYN

   MKP-BNSA

90.000

1.300

180.000

2.600

(c)

Branch Line

(‘D’ Routes )

   JHS-CNB

   KID-BZM

   JHS-MKP

   BNSA-OHAN

   MBA-KURJ

   LAR-TKMG

213.000

118.030

290.500

1.850

64.642

64.650

221.300

118.020

290.500

1.850

64.642

64.650

(d)

(‘E’ Route)

   AIT-KONCH

   GWL-BIX

   GWL-PNHR

   AGD-MALKHEDI

13.540

79.035

0.750

6.521

13.540

79.035

0.750

6.521

(e)

Other Route (NG)

   GWO-SOE

  

199.800

199.800

Total

1489.683

1908.683

BRIDGES

JHANSI DIVISION  (As on 1.4.2016)

Sr.

No.

Type of Bridge

‘A’ Route

‘B’, ‘D’ &’E’ Route

Narrow Gauge

Total

1

Important

8

11

0

19

2

Major

94

99

34

227

3

Minor

771

1120

418

2309

Total

873

1230

452

2555

4

R.O.B.

5

5

0

10

5

F.O.B

18

15

0

33

STAFF QUARTERS

There are total 5658 nos. of quarters in the Division. Type wise break up is as under:

Sr.

No

Type of Quarter

No. of Quarters

1

   Type – I      (RB-I, MA, K, J, MAP)

3495

2

   Type – II     (RB-II, H, MB)

1335

3

   Type – III    (RB-III, G, F, D)

570

4

   Type – IV    (RB-IV, RB-IV/Spl, B, C, E)

187

5

   Type – V     (RB-V, RB-V/Spl., A)

45

6

   Others         (Temp)

26

   Total

5658

RULING GRADIENTS

‘A’Route                                      UP Road                                DN Road

BIN-JHS            -            1/200 – Rising (DLA-BJA)         1/200 – Rising (BZY-BPW)

JHS-GWL          -           1/158 – Falling (SLV-ARI)           1/150 – Rising (ARI-SLV)

            GWL-DHO         -           1/174 – Falling (DHO-HET)        1/236 – Falling (GWL-BLNR)

            GWL-DHO         -           1/118 – Rising (BLNR-GWL)       1/136 – Rising (MRA-SIKD)

‘B’ Route

MKP-ALD         -           1/150 – Rising (LOG-MFX)        1/150 – Falling (LOG-MFX) 

‘D’ Route

JHS-BZM          -           1/200 – Rising (GRM-JHS)        1/200 – Falling (JHS-GRM)

JHS-BNDA        -           1/125 – Falling (RNRD-TKA)      1/125 – Falling (JHS-ORC)

- 1/125 – Falling (ORC-BWR       1/125 – Falling (BWR-NEW)

- 1/125 – Rising (NEW-MGPR)     1/125 – Rising (RORA-HPP)

BNDA-MKP       -           1/150 – Rising                           1/150 – Rising (KHOH-BIP,

(OHAN-BIP, BIP-KHOH)                          BIP-OHAN)

MBA-KURJ       -           1/150 – Falling (MBA-CHTT)      1/120 – Rising (RJAK-KURJ)

BNDA-BZM       -           1/150 – Rising (DPSR-JSB)       1/150 – Rising (KID-ICL)

                                     1/150 – Falling (PTRE-KTRR)

BNSA-OHAN     -           1/158 – Rising (BNSA-OHAN)

‘E’ Route

AIT-KNH            -           1/200 – Rising (AIT-KNH)            

GWL-BIX           -           1/150 – Falling (SAC-RAKL)

            Narrow Gauge

GWO-SOE        -           1/80   – Falling (BIB-SPRA)

           

CURVES

Sr. No.

Details

‘A’ Route

‘B’, ‘D’ &’E’ Route

Narrow Gauge

Total

1

No. of Curves

259

256

119

634

2

Length of Curves     (Kms.)

139.010

166.288

22.552

327.85

3

Maximum curvature (Deg.)

28º

LAND UTILISATION

Sr. No.

Details

Area

(in Hectares)

TOTAL LAND WITH THE DIVISION

6715.629

1.

Utilization of Fixed Assets

(Rly.Track, Colony, Office, Station etc.)

6089.150

2.

Under afforestation (Deptt./Forest Deptt.)

190.000

3.

Under Commercial Licensing.

3.019

4.

Other use like Pisces culture

0

5.

Land under Encroachment

1.436

6.

Land lying vacant

336.974

7.

Under GMF

95.050

TOTAL

6715.629




Source : North Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 01-11-2016  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.