For the financial Year-2012-2013 | | | | | Annexure-I |
|
Sl. No. | Item |
|
| Details |
|
|
|
|
1 | General | | | | | | | |
| a) Name of the Training Institution | Basic Training Centre (Loco) Jhansi |
|
|
| b) Location of the Training institution (with map in A4 size as Annex.-1) | Steam Loco Shed Jhansi |
|
|
|
| c) Complete postal address with PIN Code | Basic Training Centre(Loco) Jhansi,C/O CCC Office,Steam Loco Shed Jhansi-284001 |
| d) Details of ISO and other certifications obtained, if any | Nil |
|
|
|
|
| e) Telephone Number of the training institution | Railway |
| DOT/MTNL (with STD Code) | Fax |
| | | | 037-55428,55434 | | | 0510-2442225 |
| f) Web site address of the Institution | | | Nil | | |
| g) Date of setting up | | | | 21.04.1992 as BTC(LOCO)Jhansi |
| h) Whether recognized by Railway Board (Tick appropriately) | | | | Yes/No |
| i) Nominated Training Manager by Railway Board/Railway (Name and Designation) | Sh.A.K.RAWAL/CEE/NCR | |
2 | Details of the in-charge | | | | | | |
| i) Name | | | | | V.K.SHARMA | |
| ii) Designation | | | | Instructor | | |
| iii) Mobile number | | | | 9794847010 | | |
| iv) Email address | | | | | | |
| v) Date (dd/mm/yy) of Joining Training Institution | | | 13.07.2009 | |
| vi) Scale of Pay and Grade Pay | | | 9300/- - 34800(GP-4600/) |
3 | a) Objectives of the training Institution | | | To impart training to all categories of running staff (LP's, LP/Shtg., ALP's) |
| b) Broad category of staff being trained (Name five major categories only) | All categories of running staff. |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | Page-02 | | | | |
4 | Infrastructure | | | | | | |
| a) Layout | | | | | | | |
| i) Total area of the training institution (in Acres) | | | 5000 sq. Feet (approx.) | |
| ii) Total covered area (sq. meter) | | | | | |
| iii) Total open area (sq. meter) | | | | | | |
| iv) Layout Plan | | Nil -To be attached in A4 size as Annexure-II | |
| v) Landscaping/Gardening (Tick appropriately) | | | | Yes/No | |
| vi) Power Supply availability (Tick appropriately) | a) Less than 10 hrs. in a day b) 10-12 hrs. in a day c) 13-14 hrs. in a day d) More than 18 hrs. in a day |
| vii) Availability of Generator back up / Power back up for | Office | Class rooms |
| Hostel |
| Mess |
| | | Yes / No | Yes / No | | Not Avl. | | Not Avl. |
| b) Class Rooms | | | | | | |
| i) Area (sq. meter in ascending order) of class rooms | Class 1) Room no. 1 is 94.87sq. meter 2) Room no. 2 is 93.50sq. meter |
| | | | | | | | |
| | | | | | | | |
| ii) Number of class rooms | 1 | 2 | | | | |
| | | | | | | | |
| iii) Capacity of each class room (in term of number of trainees) | 21 | 36 | | | | |
| | | | | | | | |
| iv) Average class room capacity | 28 (trainees in each class room) | | |
| C) Number of toilets near class rooms | Gents- 01 (Multiple Urinals & Lavatory) | | |
| | | | Ladies-Nil | | | | |
| d) Hostel Accommodation | | | | | | |
| i) Room Details | Single Bed | Double Bed (Sq. meter) | Triple Bed (Sq. meter) | Dormitory (4beds and above) (Sq. meter) | Ladies (Sq. meter) |
| ii) Average Area (sq. meter) of each room | Nil | Nil | Nil | Nil | Nil | Nil |
| iii) Number of rooms | Nil | Nil | Nil | Nil | Nil | Nil |
| iv) Details of toilets (if attaches) | Nil | Nil | Nil | Nil | Nil | Nil |
| v) If not attached No./Size of the toilets in hostels | Number | | | Area (Avg. size in sq. meter) |
| | | Nil | | | Nil | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | Page-03 | | | | |
| e) Model Rooms | | | | | | |
| i) Number of Model Rooms | 02 | | | | | |
| ii)Discribe layout of each (briefly) | 02 Loco Model Room | | | | | |
| iii) Average Area (sq. meter) of model rooms | | | | 92.18 sq. meter |
| iv) List of equipments in each Model Room (enclosed as Annexure-II) | | | |
| f) Library Facilities | | | | | | |
| i) Available (Tick appropriately) | Nil | | | | | |
| If available | | | | | | |
| ii) Total number of Books Available | | 05 |
|
|
|
| iii) Type of Books | | | | | | |
| | | Codes and Manuals | Technical | | Railway Publications | Others |
| Numbers | | 2 | 3 | | Nil | | Nil |
| iv) Number of Books in various Languages | | | | | |
| | | English | Hindi | | Regional Languages | Others |
| Number | | 2 | 3 | | Nil | | Nil |
| v) Library Budget (annual, if any) Details | | | Nil | | |
| g) Computer Facilities | | | | | | |
| i) Number of rooms | | | | Nil | | |
| ii) Average Area of each room (in sq. meter) | | | 92.18Sq.Meter | |
| iii) Number of Computers | | | | N/A | | |
| iv) Type of Computer Courses being run (Major 5 courses) | Nil | | | | |
| h) Medical Facilities | | | | | | |
| i) Name of Medical Centre: | | Railway Hospital,Jhansi | | | |
| ii) Whether in-Campus? | | No | | | | |
| iii) If No, Distance from Training Centre (in Kms) if located in same town | Railway Hospital | Other Public/Private Hospital |
| | | | | | App.600 Meter | 2 Km |
| i) Recreational Facilities | | | | | | |
| a) Indoor (please specify 5 major games) | Nil | | | | |
| b) Outdoor (please specify 3 major games) | Nil | | | | |
| c) Yoga / PT | | Nil | | | | |
| d) If yes, please specify timing Morning / Evening | | | | | |
| | | | | | | | |
| | | | Page-04 | | | | |
| j) Messing Facilities |
|
|
|
|
|
|
| i) Whether Available (Tick appropriately) | Nil | | | | |
| If Available |
|
|
|
|
|
|
| i) Method of Running the Mess (Tick appropriately) | Departmentally | Self managed by trainees | By contract | Any other (please specify) |
| | | | | | | | |
| k) Kitchen Facilities (Whether Available) | | | No | | |
| i) If available | | Area (sq. meter) | Facility available (please specify in separate Annexure-iv) |
| | | | | | | | |
| ii) Dinning Hall (Whether Available) | | | No |
|
|
| iii) If available | | Area (Sq. meter) | Seating Capacity (in term of diners who can be served at the same time) |
| | | | | | | | |
| iv) Pantry Room | | Nil | | | | |
| v) Dish washing Area | | Nil | | | | |
| If yes, furnish details of washing area |
|
|
|
|
|
| a) Size in sq. meters | | Nil | | | | |
| b) Type of Detergents / Chemicals being used | Nil | | | | |
| l) Other Facilities | Bank | ATM |
| Railway Station | Bus Stand |
| i) Available within campus | No | No | | No | | No |
| ii) If not available within campus, distance from the training institution (in Km.) in the city. | 1.0 Km. | 1.0 Km. | | 1.0 Km. | | 5.0 Km. |
| | | | | | | | |
| | | | | | | | |
| | | | Page-05 | | | | |
5 | Faculty |
|
|
|
|
|
|
|
| a) Detail of Gazetted faculty | | Nil | | | | |
| b) Detail of Non-Gazetted faculty with their date of joining the training centre. | 01 V.K.Sharma (LPTM/Medically De-Categorized) 13.07.09 |
| c) Grade-wise sanction and on-roll strength of trainers /instructors | SS | MOR | Vac | Remarks |
|
| | | | 02 (9300/-34800/) GP-4600 | 01 (9300/-34800/) GP-4600 | 01 | Sanction of 02 Chief Loco Inspector but due to vacancies in CLI cadre Supernumarary post candidate utillizing |
| d) Training of Traoners (TOT) Course | | | | | |
| i) Number of trainers who have done TOT course | | | Nil | | |
| ii) Number of trainers who have not done TOT course | | | 1 | | |
| e) Details of visiting faculty (5 Names to be given) who have given lecture in FY 12-13. | | |
| Name | | Designation | Company / Organization | Date of visiting | Remarks if any |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
6 | Detail of Disaster Management Training (if applicable) Not applicable |
|
| a) No. of programmes conducted-separate Annexure VIII, to be attached. | | x | |
| b) Average duration of each programme (in days) | | | | x | |
| c) Total number of trainees attended Disaster Management Programmes in FY 12-13. | x | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | Page-06 | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
7 | Training Aids |
|
|
|
|
|
|
| a) Over Head Projector | | Available (Yes) | | If Available | |
| | | | | | | Number | 1 |
| b) White Board | | Available (Yes) | | | Number | 3 |
| c) Flip Chart Board | | Available (No) | | | If Available | |
| | | | | | | Number | Nil |
| d) TV / Projection Board | | Available (Yes) | | | If Available | |
| | | | | | | Number | 1 |
| e) LCD Projector | | Available (Yes) | | | If Available | |
| | | | | | | Number | 1 |
| f) VCR/DVD/CD Player | | Available (No) | | | If Available | |
| | | | | | | Number | Nil |
| g) Video Camera/Digital Camera | Available (No) | | | If Available | |
| | | | | | | Number | Nil |
| h) Photocopying/(Resograph) | | Available (No) | | | If Available | |
| | | | | | | Number | Nil |
| i) Digital Scanner | | Available (No) | | | If Available | |
| | | | | | | Number | Nil |
| j) PC (other computer room) | | Available (No) | | | If Available | |
| | | | | | | Number | Nil |
| k) Laptop | | | Available (No) | | | If Available | |
| | | | | | | Number | 0 |
| l) Printer | | | Available (No) | | | If Available | |
| | | | | | | Number | Nil |
| m) Other Photocopying Facilties (Gastetner) | Available (No) | | | If Available | |
| | | | | | | Number | Nil |
| n) Public Address Systems | | Available (Yes) | | | If Available | |
| | | | | | | Number | 1 |
| o) Any other (please specify) | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | Page-07 | | | | |
8 | Capacity Utilization |
|
|
|
|
|
|
| a) Planned Capacity | In terms of trainees seats | | In terms of trainees days |
| | | Nil | | | Nil | | |
| b) Capacity Utilization (Including three previous financial year) | Year | In terms of trainees seat | | In terms of trainees days |
| | | 2012-13 | 8540 | | | 7896 | |
| | | 2011-12 | 16800 | | | 761 | |
| | | 2010-11 | 16688 | | | 704 | |
| | | 2009-10 | 16744 | | | 575 | |
| c) Details of Trainees who have completed the training in FY 2012-13 (separate Annexure IX to be attached giving Name designation, Name of course attended, No. of days of training) |
| | | | | | | | |
| d) Number of one day/two days crash training organized during the year 2012-13 | | 1642 (One day Capsule Courses on Aoutomatic Competency/TPWS) |
| | | | | | | | |
9 | Budget Utilization |
|
|
|
|
|
|
| a) Name of Officer Controlling the budget | Sr. DFM/JHS | | | | | |
| | | | | | | | |
| b)Budget (for the current year and the three preceding financial years) | Year | Allotment (fig. in thousand) | Utilization (fig. in thousand) |
| | | 2012-13 | Nil | | | Nil | |
| | | | | | | | |
| c) Works Programme (if any) in progress/sanctioned for the training institution | | | |
| A. Pink Book (List each work) | | | | | |
| Item No. | Year of sanction | Nature of work | Anticipated cost in (000 of Rs.) | Budget Utilization so far in (000 of Rs.) | Progrss of work (% completion) | Likely Target of completion of work (if not done) |
| Nil | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| B. GM's LAW Book (List each work) | | | | | |
| Item No. | Year of sanction | Nature of work | Anticipated cost (figure in thousand) | Budget Utilization so far | Progrss of work | Likely Target of completion of work |
| Nil | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | Page-08 | | | | |
10 | Maintenance of Institution |
|
|
|
|
|
|
| a) Agency Responsible | | | | | | |
| i) Civil Maintenance | | DEN/JHS | | | | |
| ii) Electrical Maintenance | | Sr. DEE/G/JHS (for power supply, DG) |
| | | | | | | | |
| iii) S&T Maintenance | | Sr. DSTE/JHS | | | | |
| iv) Sanitation | | Nil | | | | |
| b) If done departmentally, details of staff available for maintenance |
|
|
|
|
| Category |
| Sanction |
| On Roll |
| Vacancy |
| Nil | | | Nil | | Nil | | Nil |
| Nil | | | Nil | | Nil | | Nil |
| Nil | | | Nil | | Nil | | Nil |
| c) If outsourced, details of maintenance arrangements |
|
|
|
|
|
| i) Name of maintenance contactor | N/A | | | | |
| ii) Scope of work |
| | | | | |
| iii) Contract value (in Rs) |
| | | | | |
| iv) Duration of contract |
| | | | | |
11 | Inspections |
|
|
|
|
|
|
| i) Number of Inspection done in 2012-13 | By SAG Officers | By JAG Officers | By Other Officers |
| 08 |
|
| CEE/NCR | | Sr.DEE/OP/JHS | DEE/OP/JHS |
|
|
|
| CELE/NCR | | Sr.DEE/TRS/JHS | ADEE/OP/JHS |
|
|
|
| | | Sr.DME(O&F) JHS | ADSO/JHS |
| ii) Details of Inspections |
|
|
|
|
|
|
| Designation of the Inspecting Authority | Date of Visit | Outcome of the Inspection report |
| CEE/NCR | | 02.04.12 | Emmphasis given to Prevent SPAD | | |
| CELE/NCR | | 02.04.12, 24.07.12, 19.03.13 | Emphasis given to prevent SPAD cases and provide technical knowledge/trouble shooting on 3phase locomotive. |
| Sr.DEE/OP/JHS | 2.09.12, 03.10.12, 27.11.12 31.01.13 19.03.13 | Emphasis given to provide training on modified semi-automatic signalling system working and rules regarding safe yard shunting ,prvent SPAD cases. |
| Sr.DEE/TRS/JHS | 02.04.13, 19.03.13 | Emphasis given toprevent SPAD cases & to arrange working model of SIV. |
| Sr.DME(O&F)JHS | 19.03.13 | Practical training regarding coupling/Uncoupling of CBC to provide through H-Type coupler model. |
| DEE/OP/JHS | 02.04/18.07/12.08/ 29.08/03.10.12 | SPAD and emphessis given on stress free working through Yoga/Meditation and positive thinking. |
| ADSO/JHS | | 18.07.12 | Training /Xcounselling to be focussed on SPAD | | |
| ADEE/OP/JHS | 27.11.12/31.01.13, 19.03.13 | Emphessis given to provide proper knowledge to LP/ALP regarding working & resetting of VCD. |
| | | Page-09 | | | | | |
| | | | | | | | |
12 | Training Methodology (Tick appropriately) |
|
|
|
|
|
| Lecture |
| Discussion | Group Activity | Individual Activity | Collaborative Learning |
| Yes/No | | Yes/No | Yes/No | Yes/No | | Yes/No | |
| Action Learning | Problem Based Learning | Case Study | Learning Games | Videos |
|
| Yes/No | | Yes/No | Yes/No | Yes/No | | Yes/No | |
| Printed Material | Computer Aided Instruction | Simulators | | | | |
| Yes/No | | Yes/No | Yes/No | | | | |
13 | Feedback/Evaluation | | | | | | |
| a) Is there a feedback system in existence | | | | Yes/No | |
| If yes, what is the average rating obtained in respect of the following in 2010-11 | | | |
| Note:- A 5 point rating scale (1 being the lowest, 5 being highest) to be used. If not specify the rating scale used (Tick appropriately) | Whether 3points/ 7points/ 10points rating scale is used. |
| Parameters |
|
|
|
| Rating |
|
| i) Overall maintenance | | | | | | |
| ii) Quality of food in mess | | | | | | |
| iii) Overall quality of instruction | | | | | Rating is not used |
| iv) Overall participants satisfaction | | | | | |