Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

IR Personnel

News & Recruitment

Tenders & Notices

Vendor Information

Public Services

Contact Us

Covid-19
IGOT- Training Videos from IGOT
Important updates from MoHFW
GM In Press Media
Achievements
News & Announcements
Press Releases
Recruitment
Engagement of Act Apprentice under Apprentice Act 1961 for the year 2017-18
Re-engagement of Retired Employee/Officers
Railway College Tundla
EOI Medial Kanpur
Provisional allotment of divisions to the Technicians of CEN No 01/2018
Division Allotment for RRB/RRC panel
Walk-in-Interview for Doctors o­n 28.04.2020
Recruitment of Constable (Band) in RPF
WALK IN INTERVIEW FOR PART TIME DENTAL SURGEN
Asst Loco Pilot Div Allotment
Recruitment against Sports Quota 2016-17
Allotment of Divn to RRB Selectes Candidate
Recruitment by RRC
Engagements of doctors on contract basis (CMP)
General Departmental Competitive Examination(GDCE)
Rajbhasha Library
Rail Sangam
Pratush
Public Information Regarding Train Accident
Train Accidents Inquiry Reports
 
Bookmark Mail this page Print this page
QUICK LINKS
12-07-2021
General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

उत्‍तर मध्‍य रेलवे

 जनसम्‍पर्क कार्यालय

                     उत्‍तरमध्‍य रेलवेप्रयागराज

पत्रांक: 11पीआर/07/2021                                               प्रेस विज्ञप्ति                                                 दिनांक: 09.07.2021

General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

Shri V K Tripathi, General Manager North Central Railway and North Eastern Railway during his two days visit to Jhansi Division started his inspection from Bhimsen station of Bhimsen-Jhansi section. Shri Tripathi reviewed the layout plan of the proposed Logistic Park at Bhimsen station. He also inspected and discussed the connectivity of the logistics park with upcoming Dedicated Freight Corridor (DFC). Apart from this, there was a detailed discussion about  systematic development at Bhimsen station. After departing from Bhimsen station, the GM inspected Malasa-Pukhrayan-Chaunrah- Kalpi-Usargaon section and Parauna- Erich Road-Moth-Nandkhas sections. He inspected the progress of doubling work of section through rear window of inspection carriage.

After reaching Jhansi, Shri Tripathi along with the Divisional Railway Manager Shri Sandeep Mathur reviewed the o­ngoing projects of Jhansi Division. He expressed satisfaction over the progress of o­ngoing passenger amenities works,. After the meeting, General Manager met with the office bearers of the union and association and discussed various important issues for the welfare of the employees.

General Manager also met the media persons of Jhansi Division and briefed them regarding progress of works related to passenger facilities. He informed the media that the doubling work of Jhansi-Kanpur railway section would be completed by June 2022. He also shared the good news of sanctioning the work of construction of ROB at level crossing gate number 117 (on Jhansi-Gwalior road route).

After that, Shri Tripathi left for the window trailing inspection of Jhansi-Lalitpur section as per his schedule. After reaching Lalitpur station, he took stock of the o­ngoing projects and saw the works related to the third line. He inspected the passenger facilities. Later he reached Khajuraho station.

It is to be informed that  Window-trailing inspection is a specialized inspection in the Indian Railways in which the track and its surrounding installations like signals, OHE, platforms etc are inspected from the rear window of an inspection car attached to a moving train. During the inspection, important parameters like cleanliness and overall condition of stations falling en-route, riding quality of the train-especially o­n points and crossings, improvement in Track Geometry Index (TGI), , OHE status, Jhansi-Kanpur doubling and Jhansi-Lalitpur third line construction and electrification work, Condition of level crossing gates en-route etc were observed by the General Manager/North Central Railway. During the inspection, General Manager directed the Divisional Railway Manager, Jhansi that

• Scrap lying along the tracks  should be removed.

• Action should be taken against the trace passers by identifying the locations of  trace passing.

• Improved level of maintenance of switch expansion joints, points, crossings and yards to be ascertained to improve riding quality and safety.

During the window trailing inspection, Shri Dinesh Verma, Additional Divisional Railway Manager (Operations), Shri Amit Sengar, Additional Divisional Railway Manager (Technical), Shri Deepak Nigam, Chief Workshop Manager (CMLR) and Shri R D Maurya, Chief Workshop Manager (Wagon Repair Workshop) along with and other senior officers of the division were present.                                                                                                                          





  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.