Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

IR Personnel

News & Recruitment

Tenders & Notices

Vendor Information

Public Services

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS

ELECTRICAL GENERAL SERVICE

1.         GENERAL INTRODUCTION –

1.1       GAZZETTED OFFICERS - Sr. DEE/G/JHS and ADEE/G/JHS.

1.2       Staff Non-gazzetted.

S.N.

Category

OSM group

TL/AC group

S/S

O/R

S/S

O/R

1

Supervisors

24

18

14

11

2

Skilled

109

96

142

97

3

Un-skilled

188

130

107

89

Total

321

244

263

197

1.3       Electrified Station:

Electrified/Non-electrified

Main line

Branch line

NG line

Total

Electrified stations

36

83

17

136

Non-electrified stations

02

14

10

26

Total no of stations

36

95

27

162

           

1.4       Power Supply System:

Sub-stations

46

Transformers

115

Stationary DG sets

26

5 KVA DG sets

60

1.5       Staff Quarters:

Electrified staff quarters

4722

1.6       Electrical Pumps:

S. N.

Type of pump

Qty

1

Vertical turbine pumps

04

2

Submersible pumps

262

3

Centrifugal pumps

20

4

Mono block pumps

83

5

Jet pumps

02

6

Sewage pump

07

Total

378

1.7       Water Coolers:

S. N.

Water coolers

Qty

1

On platform

110

2

Offices & Others places

105

Total

215

1.8       Maintenance depots:

Major maintenance depots for OSM

06 JHS (East, West, Diesel Shed), GWL, ORAI, BNDA

Minor maintenance depots for OSM

04 (LAR, JUHI, CKTD & KURJ)

Major maintenance depots for TL-

AC

02 (JHS & GWL)

Minor maintenance depots for TL-

AC

02 (BNDA & KURJ)

1.9       Train lighting & Air conditioning assets:

Rakes for Primary 

maintenance

43 (BG/38 & NG/05)

TL coaches    

469 (JHS/220, KURJ/06 & GWL/243)

AC coaches

70 (JHS/19, KURJ/01 & GWL/50)

Power Cars

05 (GWL)

Battery charging sets

29 (JHS/13, KURJ/3, BNDA/01, GWL/ BG-11 & NG/01)

Pre-cooling points

256 (JHS/132, BAB/12, KURJ/20 & GWL/(92)

2. Status of Action Plan target for General Service

SN

Items

Target                            (2019-20)

Cumulative up to Jan-2020

Remarks

A

ENERGY CONSERVATION

 

 

 

1

Non-traction electric consumption in MU.

31.56

20.67

-

B

LED

1

LED lighting in all office building.

100%

100% completed.

-

2

One time provision of LED lighting in all staff quartetrs.

100%

100% completed.

-

C

SOLAR

-

1

Electrification of  L-Xing gates through SPV module

48

100% completed.

-

D

OTHERS

1

Air conditioning of all running room.

100%

100% completed.

-

2

Checking of earthing arrangement.

At all installation

-

Earthing value is being checked time to time.

 


3. Other Important ongoing work/activities:

SN

 Name of Work

Tender         No.

Tender Cost

Present status

1

Electrical work for: - Provision of New LED Facade lighting arrangement at Jhansi station.

JHS/ELG/W/T-22/2019-20

89,44,050

Under finalization with TC.

2(a)

Jhansi division:-Provision of national flag at BNDA, CKTD, MCSC, DAA, LAR, MRA, BIX, MBA, SOE, TKMG, HAR, and KURJ station.

JHS/ELG/W/T-17/19-20/RT

15890582

Discharge Tender

2(b)

Jhansi division:-Provision of national flag at BNDA, CKTD, MCSC, DAA, LAR, MRA, BIX, MBA, SOE, TKMG, HAR, and KURJ station.

JHS/ELG/W/T-02-22/21

1,10,87,088

TC Under finalization

3

Electrical work for-

Jhansi Division: Provision of

Filter plant (Rapid) to meet out additional demand of water of Jhs.

T-06/2020-21

27,51,010

TC Under finalization

4

Electrical work for: - Improvement of  Illumination level as per Airport Standard at all station over Jhansi Division.

T-01

20-2021

1,17,44,312

Under finalization with TC.

3.1 Lifts and Escalators:

A.Old Lifts status:

DIV

Name of stations

Loc.

Qty

Completed

TDC

Remarks

JHS

JHS

PF-2/3

01

Completed

PF-4/5

01

-------

Civil work not started but lift supplied.

GWL

PF-1

01

Completed

PF-2/3

01

Completed

PF-4/5

01

Completed

B. New sanctioned Lifts-

S.N

DIV

Original (As per Board’s letter)

Revision under proposal

Current status

Station

No. of lift

Station

No. of lift

Estimate has been vetted.

Required to be sanctioned on IRPSM.

1

JHS

BANDA

2

BANDA

2

2

ORAI

2

ORAI

2

3

MBA

2

MBA

2

4

MRA

2

KURJ

2

5

LAR

2

6

CKTD

2

DAA

01

C.New sanctioned Escalators-

DIV

Original (As per Board’s letter)

Revised (As done by Railway)

Current status

Station

No. of Escalators

Station

No. of Escalators

Electrical Depot PO issued. Engg Dept. NIT to be issued

JHS

GWL

6

DAA

2

JHS

4

LAR

2

LAR

2

           

            4. Updated performance, Highlights/ Achievements of Electrical General Jhansi division    for the period Jan/20 to July/20:


1.Electrification work of New ASM Building and El building have been completed at RNRD, MRPR and RORA stations.

2.Pre Monsoon preparedness drive completed at all the stations in Jhansi division .

3.04 nos. new Window AC has been commissioned at various places in DRM office, Jhansi .

4.496 Nos. different wattage of LED bulbs have been provided at various offices, East colony and West colony service buildings at Jhansi & outside stations as energy conservation measures .

5.09 nos. AC & 38 nos. Non-AC coaches intermediate over hauling have been done at JHS & GWL depots.

6.Total 89837.4 units generated by solar plants over JHS division in FY 2020-21 which amounts to Rs. 353959.36/- savings for Railways up to the month of May-2020.

7.5322 nos. LED fittings of different wattage provided/replaced in station service buildings in Jhansi division as energy conservation measures.

8.Rs. 134.34 Lakh has been recovered during the financial year 2019-20 up to January by vendors and outsiders.

5.         Innovations and System improvement:


1.One High-Volume Low-Speed fan (HVLS fan) at Yatri shed and one Brushless Direct Currentfan (BLDC fan) at Sr.DEE/G/JHS office have been provided as trial basis in Jhansi.

2.Solar based rechargeable wall fan provided at LC-370 C on trial basis.





Source : North Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 30-07-2020  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.