ELECTRICAL GENERAL SERVICE
1. GENERAL INTRODUCTION–
1.1 GAZZETTED OFFICERS - Sr. DEE/G/JHS and ADEE/G/JHS.
1.2 Staff Non-gazzetted.
S.N. | Category | OSM group | TL/AC group |
S/S | O/R | S/S | O/R |
1 | Supervisors | 24 | 21 | 14 | 11 |
2 | Skilled | 109 | 80 | 136 | 76 |
3 | Un-skilled | 188 | 128 | 95 | 91 |
| Total | 321 | 229 | 245 | 178 |
1.3 Electrified Station:
Electrified/Non-electrified | Main line | Branch line | NG line | Total |
Electrified stations | 36 | 84 | 17 | 137 |
Non-electrified stations | 02 | 14 | 10 | 26 |
Total no of stations | 38 | 98 | 27 | 163 |
1.4 Power Supply System:
Sub-stations | 46 |
Transformers | 127 |
Stationary DG sets | 26 |
5 KVA DG sets | 51 |
1.5 Staff Quarters:
Electrified staff quarters | 4722 |
1.6 Electrical Pumps:
S. N. | Type of pump | Qty |
1 | Vertical turbine pumps | 04 |
2 | Submersible pumps | 286 |
3 | Centrifugal pumps | 24 |
4 | Mono block pumps | 83 |
5 | Jet pumps | 02 |
6 | Sewage pump | 07 |
| Total | 406 |
1.7 Water Coolers:
S. N. | Water coolers | Qty |
1 | On platform | 110 |
2 | Offices & Others places | 100 |
| Total | 210 |
1.8 Maintenance depots:
Major maintenance depots for OSM | 06 JHS (East, West, Diesel Shed), GWL, ORAI, BNDA |
Minor maintenance depots for OSM | 04 (LAR, JUHI, CKTD & KURJ) |
Major maintenance depots for TL-AC | 02 (JHS & GWL) |
Minor maintenance depots for TL-AC | 02 (BNDA & KURJ) |
1.9 Train lighting & Air conditioning assets:
Rakes for Primary maintenance | 43(BG/38 & NG/05) |
TL coaches | 396 (JHS/212, KURJ/38 & GWL/146) |
AC coaches | 67(JHS/20, KURJ/08 & GWL/39) |
Power Cars | 05 (GWL) |
Battery charging sets | 29 (JHS/13, KURJ/3, BNDA/01, GWL/ BG-11 & NG/01) |
Pre-cooling points | 256 (JHS/132, BAB/12, KURJ/20 & GWL/(92) |
2. Lifts and Escalators:
2.1 Existing Escalator over Jhansi Division
SN | Station | Location | Qty | Present status |
1 | JHS | PF No. 1 CSMT end | 1 | Escalator installed on 18.01.2018 |
PF No. 1 CSMT end | 1 | Escalator installed on 07.06.2015 |
PF No. 2/3 CSMT end | 1 | Escalator installed on 07.06.2015 |
2 | GWL | PF No. 1 NDLS end | 1 | Escalator installed on 25.12.2017 |
PF No. 2/3 NDLS end | 1 | Escalator installed on 12.12.2017 |
2.2 Future Planning of Escalator over Jhansi Division
SN | Station | Location | Qty | Status of civil work | Status of Electrical work | TDC |
1 | JHS | PF No. 1 NDLS end | 1 | Letter has been written to Sr.DEN (Co)/JHS for executing the civil part of work, but work not started yet. | PO issued on 14.11.2019 to M/S Johnson Lifts Pvt. Ltd. Chennai. | 04 nos. to be commissioned on new FOB which is to be constructed by Dy. CE/Bridge line/JHS Structural drawing handed over to JLPL on 01/02/2021 for making GAD |
PF No. 1 NDLS end | 1 |
PF No. 2/3 NDLS end | 1 |
PF No. 4/5 NDLS end | 1 |
2 | LAR | PF No. 1& 2/3 | 2 | GAD of LAR escalator has been approved on dated 07.12.2020. |
3 | GWL | PF No. 1 | 2 | | | |
2.3. Existing lift over Jhansi Division
SN | Station | Location | Qty | Status of civil work | Status of Electrical work | TDC |
1 | Jhansi | PF No. 1 | 1 | Completed | Lift installed on 18.01.2019 | Completed |
PF No. 2/3 | 1 | Cladding work is in progress | Installed | Under commissioning |
PF No. 4/5 | 1 | Not started yet | Not started yet | |
2 | Gwalior | PF No. 1 | 1 | Completed | Lift installed on 17.07.2020 | Completed |
PF No. 2/3 | 1 | Completed | Lift installed on 06.01.2020 | Completed |
PF No. 4/5 | 1 | Completed | Lift installed on 06.12.2019 | Completed |
2.4 Future Planning of lift over Jhansi Division
SN | Station | Location | Qty | Status of civil work | Status of Electrical work | TDC |
3 | BNDA | PF No. 1 | 1 | Estimate has been vetted and was forwarded for sanction on IRPSM but the proposal has been returned back as per of letter no. 2020/FX-II/BW/3 dated 28.07.2020 to keep the work in abeyance & sent again to HQ through IRPSM on 08/02/2021 for sanction of GM. | NA |
PF No. 2 | 1 |
4 | MBA | PF No. 1 | 1 |
PF No. 2 | 1 |
5 | ORAI | PF No. 1 | 1 |
PF No. 2 | 1 |
6 | KURJ | PF No. 1 | 1 |
PF No. 2 | 1 |
7 | DAA | PF No. 1 | 1 |
3. Innovations and System improvement (period Apr/20-Jan/21):
1.LED Façade lighting arrangement has been provided at GWL station.
2.LOA for LED Façade lighting at Jhansi railway station building has been awarded to M/s Vin Semiconductors, Mumbai. Work is held up due to renovation work of Jhansi railway station building.
3.LOA for 12 nos. National Flag at BNDA, CKTD, MCSC, DAA, LAR, MRA, BIX, MBA, SOE, TKMG, HAR & KURJ has been issued to M/s Bajaj Electricals Ltd, Mumbai on dated 10.08.2020. Flag Mast Foundation work is in progress and other material is being manufactured at Pune.
4.In order to provide Lighting on both sides of LC gates, the department has awarded tender no. JHS-ELG-W-T-10-20-21 for providing Solar light on both side of the LC gate to M/s Vertex, Delhi on 29.10.2020.