Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

IR Personnel

News & Recruitment

Tenders & Notices

Vendor Information

Public Services

Contact Us

About Us
   Divisions
      Jhansi Division
         Electrical
            Electrical TRD


 
Bookmark Mail this page Print this page
QUICK LINKS
Electrical TRD


Electric (TD)

1. Introduction:

Jhansi division has electrified section from DHO (Excluding) to Bina (Excluding) (320.75 RKM & 838.365 TKM), JHS to GOY (232.248 RKM & 321.083 TKM), KID(Incl) -BZM(Ex) (118.03RKM & 132.023TKM), JHS(Ex)-MKP(Ex) (290.0RKM & 349.977 TKM), LAR to Udaipura (38.331 RKM & 66.84TKM), PRN-AIT-BHUA(doubling) (TKM-27.841KM), & JHS-NDK (doubling) (TKM-54.99),  ATA-URG-SSKI (doubling) (TKM-25.238KM) , BHUA-OR-SSKI (Doubling ) (TKM-22.421KM) RRU Marshlling goods yard modification (TKM-05KM)Totaling 999.359 RKM & 1843.778 TKM.

There are 17 Traction sub stations, out of which 11 Traction Substations are in (UP) at Lalitpur, Mustara, Moth, Lalpur , Sarsoki, Mahoba, Raghaul, Dingwahi, Udaipura Ghatampur and Khoh, getting 132 KV incoming supply from open access and 04 Traction Substations are in (MP) namely Hetampur, Gwalior, Datia, Basai, getting 132 KV incoming supply from open access.

            02 Nos. of TSS (NEW & HPP ) are still to be taken on load, work is pending from RE end.

2.         Organization

          Gazetted-          Sr.DEE (TD) is assisted by one Sr.Scale Officer (Gwalior) and                                                       three Jr. scale officers (one at Jhansi, one at Orai & one at

                                      Banda), Banda post is lying vacant.

            Non-Gazetted –         Sanctioned strength- 606 Nos.

                                                On Roll -     490 Nos.

                                                Vacancies - 116 Nos.

ASSETS:  -   Assets at a glance of TRD branch of JHS division are as under –


S.N.

Details

Holding

1.

Major Depots

12Nos.(LAR, JHS, GWL, DHO,OR, MRPR, MBA, DWI, SWC, GTM, BSZ & UDPR)

2.

Minor depots

5 (TBT, BAB, DBA, CGN & PHN)

3.

RKMs

999.359 Km

4.

TKM

1843.778 TKM

5.

TSSs

Total 17 Nos (NEW & HPP TSS still not commissioned).

6.

SPs

21 Nos.

7.

SSPs

53 Nos.


OHE Depot in DHO-jhs section:-

Sr.N0.

Details

Holding

Total

1.

Major Depots

DHO, GWL, JHS

03

2.

Minor depots

DBA

01

3.

RKMs

182.70 kM

182.70

4.

TKMs

504.47 TKM

504.47

5.

TSS

HET, GWL, DAA

03




3.Staff position:-

SUMMARY OF STAFF POSITION

Sr.No

CATEGORY

SANC

ACTUAL

VAC

1

SSE

60

49

11

2

JE

32

6

26

3

Draftman

3

0

3

4

Artisan

226

184

42

5

Group “D”

259

234

25

6

Min Staff

26

17

9

 

Grant Total

606

490

116


4.Details of open access and saving in energy bills:-

Sl.No.

Supply authorities

TSS Name

Supply transferred to open access

Saving in energy bill in Rs.

Cost per unit

Nodal Railway

1

TSS covered MP

HET

21.03.16 at 00.00hrs.

Rs 15,50,79,743/-

(from 01.04.20 to 31.03.21)

Rs 5.65

WCR Jabalpur

GWL

22.01.2016 at 12.00Hrs.

DAA

BZY

2

TSS covered UP

LAR

08.07.18 at 00.00hrs.

Rs 67,83,89,853 /-

(from 01.04.20 to 31.03.21)

Rs 4.74

NR Lucknow

MSV

MOTH

SSKI

LLR

RGU

04.11.18

MBA

26.06.19

GTM

29.08.19

DWI

20.09.19

UDPR

15.10.19

KHOH

 03.07.20



          *- Saving is less due to increase in transmission charges.

5.         ENERGY DETAILS –

           

            5.1 Specific Energy Consumption (SEC) –

YEAR

GOODS

PASSENGER

OVERALL

2018-19

5.39

17.95

9.99

2019-20

5.69

18.01

10.94

2020-21

7.81

17.89

10.06

      

               5.2   ENERGY COST & CONSUMPTION –


Year

Month-March-21

Cumulative up to March-21

Total for the year

KWh

Bill(in Cr.)

Per unit cost in Rs.

KWh

Bill(in Cr.)

Per unit cost

KWh

Bill(in Cr.)

Per unit cost

2018-19

40266559

 

20.80

5.17

458500408

 

236.47

5.16

458500408

 

236.47

5.16

2019-20

35512259

 

19.46

5.48

453254545

 

225.66

4.98

453254545

 

225.66

4.98

2020-21

37720302

 

21.75

5.77

365116411

 

194.05

5.31

365116411

 

194.05

5.31


5.3 PER UNIT COST –

  

YEAR

UP open access (Per unit Cost )

MP open access

(Per unit Cost)

Combined Avg. Per unit cost. (Open access + UP)

2018-19

5.45

5.04

5.16

2019-20

5.20

4.89

4.98

2020-21

4.74

5.65

5.31

 

6.RELIABILITY MEASURES –

 

For improving reliability of OHE, the following actions have being taken.

 

 

SN.

Action taken

Achievement from

01.04.2021 to 6.07.2021

1

Replacement of S.S. Wire Rope

10 Nos.

2

Replacement of flashed and broken insulators

98 Nos.

3

Provision of missing /disconnected OHE bonds

150 Nos.

4

Replacement of “C” Jumpers

12 Nos.

5

Replacement of “G” jumpers

12 Nos.

6

Replacement of “Anti Theft Jumpers”

15 Nos.

7

Pruning of trees hazardous to OHE.

1000 Nos.

8

Provision of packing saddle as per RDSO TI No.TI/OHE/FTGFE/18 Dt.18.11.19 .

765 Nos.

 

 

7. Progress of newly Electrified Section Since 2018 -

 

(a) CRS DONE:-

Sl.No.

CRS done

Section

RKM

TKM

Electric Loco trial conducted

1

29.3.18

BZM(Excl) – HAR(Incl)

48

54.32

28/29.03.18

2

25.04.18

JHS(Excl) –HPP(Incl)

85

99.135

25/26/27.3.18

3

19.06.18

JHS(Excl)-PIC(Incl)

-

31.05

19.6.18

4

26.11.18

HPP(Excl)to KID(Incl)toHAR (Excl)

165

187.74

15.11.18 and 15.2.18 JHS to KID

5

28.2.19

PRN-BHUA

-

27.841

01.03.19

6

31.05.19

KID(Excl.) to BUS

53

72.04

31.05.19

7

27.09.19

BUS(Ex.) to MKP/SP

61

64.00

27.09.19

8

12.01.20

PIC-CGN-NDK

 

23.94

12.01.2020

9

04.03.20

ATA-URG-SSKI

 

25.238

04.03.20

10

17.03.21

BHUA-OR-SSKI

 

22.421

17.03.21

 

8. ASSISTANCE REQUIRED

(a)One post of ADEE/TD/BNDA is required for JHS-KID-BZM-MKP electrified section.

(b) One post of ADEE/TD/UDPR is required for LAR-UDPR electrified section

(c)One post of ADEE/TD is required for GWL-ETW section.

9.Pending issue with RE

 

1.HPP & NEW TSS are still not taken on load.

2Handing over of Tower wagon shed still not done atMBA, DWI, SWC & BSZ.

3.One circuit of GTM TSS not in operation.

4. Four number of overhead lines (One 33kV without guard wire in section Banda-DWI and 3 numbers 33 kV with Guard wire in JHS-ORC ) still not converted into underground cable by RE.

 





Source : North Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 19-07-2021  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.