Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

IR Personnel

News & Recruitment

Tenders & Notices

Vendor Information

Public Services

Contact Us

About Us
   Divisions
      Jhansi Division
         Electrical
            Electrical TRD


 
Bookmark Mail this page Print this page
QUICK LINKS
Electrical TRD

ELCTRICAL (TD)

 

1. Introduction:

Jhansi division has electrified section from DHO (Excluding) to Bina (Excluding) (320.75 RKM & 838.36 TKM), JHS to GOY (226.248 RKM & 321.083 TKM), KID(Incl) -BZM(Ex) (118.03RKM & 132.023TKM), JHS(Ex)-MKP(Ex) (290.0RKM & 349.977 TKM), LAR to Udaipura (38.331 RKM & 66.84TKM), MBA(Excl) to KUR(Incl) (64 RKM & 70TKM),BLNR-UDIMORE(101.212.RKM & 112.82 TKM) PRN-AIT-BHUA(doubling) (TKM-27.841KM), & JHS-NDK (doubling) (TKM-54.445), ATA-URG-SSKI (doubling) (TKM-25.322KM) , BHUA-OR-SSKI (Doubling ) (TKM-19.878KM) CHN-PHN-MLS(TKM-30.81KM) RRU Marshlling goods yard modification (TKM-05KM), JHS(Excl)to BAB(Incl) Third line electrification(TKM-29.739)Totaling 1158.571 RKM & 2091.883 TKM.

 

There are 17 Traction sub stations, out of which 11 Traction Substations are in (UP) at Lalitpur, Mustara, Moth, Lalpur , Sarsoki, Mahoba, Raghaul, Dingwahi, Udaipura Ghatampur and Khoh, getting 132 KV incoming supply from open access and 05 Traction Substations are in (MP) namely Hetampur, Gwalior, Datia, Basai & Niwari getting 132 KV incoming supply from open access.

01 No. of TSS ( HPP ) are still to be taken on load, work is pending from RE end.

2.Organization

Gazetted- Sr.DEE (TD) is assisted by one Sr.Scale Officer (Gwalior) andthree Jr. scale officers (one at Jhansi, one at Orai & one at Banda), Banda post is lying vacant.

 

Non-Gazetted –Sanctioned strength- 606 Nos.

On Roll - 473 Nos.

Vacancies - 133 Nos.

ASSETS:-Assets at a glance of TRD branch of JHS division are as under –

S.N.

Details

Holding

1.

Major Depots

14Nos.(LAR, JHS, GWL, DHO,OR, MRPR, MBA, DWI, SWC, GTM, BSZ & UDPR, BIX, & MLNR )

2.

Minor depots

5 (TBT, BAB, DBA, CGN & PHN)

3.

RKMs

1158.571 RKM

4.

TKM

2091.883 TKM

 

5.

TSSs

Total 17 Nos ( HPP TSS still not commissioned).

6.

SPs

24 Nos.

7.

SSPs

62 Nos.

 

3.Staff position:-

SUMMARY OF STAFF POSITION

Sr.No

CATEGORY

SANC

ACTUAL

VAC

1

SSE

60

48

12

2

JE

32

22

10

3

Draftman

3

1

2

4

Artisan

226

156

70

5

Group “D”

258

229

29

6

Min Staff

27

17

10

 

Grant Total

606

473

133

 

4.Details of open access and saving in energy bills:-

 

Sl.No.

Supply authorities

TSS Name

Supply transferred to open access

Saving in energy bill in Rs.

Cost per unit

Nodal Railway

1

 

TSS covered MP

HET

21.03.16 at 00.00hrs.

Rs.10,16,77,604/-

(from 01.04.21 to 31.08.21)

Rs 4.90

WCR Jabalpur

GWL

22.01.2016 at 12.00Hrs.

DAA

BZY

2

TSS covered UP

LAR

08.07.18 at 00.00hrs.

 

Rs- 14,29,33,314/-

 

(from 01.04.21 to 31.05.21)

Rs 5.16

NR Lucknow

MSV

MOTH

SSKI

LLR

RGU

04.11.18

MBA

26.06.19

GTM

29.08.19

DWI

20.09.19

UDPR

15.10.19

KHOH

03.07.20

*- Saving is less due to increase in transmission charges.

 

6. ENERGY DETAILS –

6.1 Specific Energy Consumption (SEC) –

 

YEAR

GOODS

PASSENGER

OVERALL

2018-19

5.39

17.95

9.99

2019-20

5.69

18.01

10.94

2020-21

7.81

17.89

10.06

2021-22 ( up to April-21

6.15

17.96

10.10

                     6.2   ENERGY COST & CONSUMPTION – 

 

Year

Month-April-21

Cumulative up to April-21

Total for the year

KWh

Bill(in Cr.)

Per unit cost in Rs.

KWh

Bill(in Cr.)

Per unit cost

KWh

Bill(in Cr.)

Per unit cost

2018-19

35017249

 

21.15

6.04

35017249

 

21.15

6.04

458500408

 

236.47

5.16

2019-20

38614804

 

21.71

5.62

38614804

 

21.71

5.62

453254545

 

225.66

4.98

2020-21

23253349

 

14.66

6.30

23253349

 

14.66

6.30

365116411

 

194.05

5.31

2021-22

38481174

 

19.16

4.98

38481174

 

19.16

4.98

38481174

 

19.16

4.98

     

6.3 PER UNIT COST –

 

YEAR

UP open access (Per unit Cost )

MP open access

(Per unit Cost)

Combined Avg. Per unit cost. (Open access + UP)

2018-19

5.45

5.04

5.16

2019-20

5.20

4.89

4.98

2020-21

4.74

5.65

5.31

2021-22

5.16

4.85

4.98

 

RELIABILITY MEASURES –

            For improving reliability of OHE, the following actions have being taken.

 

 

SN.

Action taken

Achievement from

01.04.2021 to 30.09.2021

1

Replacement of S.S. Wire Rope

19 Nos.

2

Replacement of flashed and broken insulators

488 Nos.

3

Provision of missing /disconnected OHE bonds

250 Nos.

4

Replacement of “C” Jumpers

12 Nos.

5

Replacement of “G” jumpers

12 Nos.

6

Replacement of “Anti Theft Jumpers”

15 Nos.

7

Pruning of trees hazardous to OHE.

2400 Nos.

8

Provision of packing saddle as per RDSO TI No.TI/OHE/FTGFE/18 Dt.18.11.19 .

1005Nos.

9

Provision of double strap in between 9T insulator and compensating plate.

146 nos out of 235

10

Checking of dwarf mast Guy Rod.

80% work completed.

  

8. Progress of newly Electrified Section Since 2018 -

 

(a) CRS DONE:-

Sl.No.

CRS done

Section

RKM

TKM

Electric Loco trial conducted

1

29.3.18

BZM(Excl) – HAR(Incl)

48

54.32

28/29.03.18

2

25.04.18

JHS(Excl) –HPP(Incl)

85

99.135

25/26/27.3.18

3

19.06.18

JHS(Excl)-PIC(Incl)

24.08

31.05

19.6.18

4

26.11.18

HPP(Excl)to KID(Incl)toHAR (Excl)

165

187.74

15.11.18 and 15.2.18 JHS to KID

5

28.2.19

PRN-BHUA

34.586

27.045

01.03.19

6

31.05.19

KID(Excl.) to BUS

53

72.04

31.05.19

7

27.09.19

BUS(Ex.) to MKP/SP

61

64.00

27.09.19

8

12.01.20

PIC-CGN-NDK()

19.079

23.94

12.01.20

9

04.03.20

ATA-URG-SSKI

17.585

25.322

04.03.20

10

17.03.21

BHUA-OR-SSKI

17.216

19.878

17.03.21

11

28.07.21

JHS(Excl.) -BAB Third line electrification

23.014

29.739

28.07.21

12

29.07.21

MBA(Excl)-KURJ(Incl)

 

64

70

29.07.21

13

28.09.21

 

CHN-PHN-MLS

19.141

30.810

28.09.21

 

14

29.09.21

BLNR-UDMR

101.212

112.82

29.09.21

 

 

 

 

 

 

9. ASSISTANCE REQUIRED

(a)One post of ADEE/TD/BNDA is required for JHS-KID-BZM-MKP electrified section.

(b) One post of ADEE/TD/UDPR is required for LAR-UDPR electrified section

(c)One post of ADEE/TD is required for GWL-ETW section.

10.Pending issue with RE

 

1.HPP is still not taken on load.

2Handing over of Tower wagon shed still not done at DWI, SWC & BSZ.

3. Four number of overhead lines (One 33kV without guard wire in section Banda-DWI and 3 numbers 33 kV with Guard wire in JHS-ORC ) still not converted into underground cable by RE.





Source : North Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 25-10-2021  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.