Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

IR Personnel

News & Recruitment

Tenders & Notices

Vendor Information

Public Services

Contact Us

About Us
   Divisions
      Jhansi Division
         S & T


 
Bookmark Mail this page Print this page
QUICK LINKS
S & T

SIGNAL & TELECOM

S&T Assets of JHS Division

Signaling Assets at a Glance

Route

RRI

Panel (MACLS)

EI

MACLS with LF/SM Slide

IBS

Interlocked LC Gates

Total

stations

Section KM

A

BIN-DHO

02

21

13+3*

-

29

43

36

319.43

Total

2

21

13+3*

29

43

36

319.43

D

Spl

VGLB-CNB

04

18

-

1

42

22

205.86

KID-MKP(Ex)

05

7

-

08

12

110.75 

Total

09

25

1

50

34

316.61

D

MBA-KURJ

2

01

02

64.49

VGLB-KID

7

6

0

16

13

180.75

KID(Ex)-BZM

4

3

2**

15

09

118.65

Total

0

13

9

2**

32

24

363.89

E

LAR-KURJ

8

00

08

164.49

BLNR-BIX

-

5

-

04

05

104.92

AIT-KNH

1

01

1

13.68

Total

9

5

05

14

283.09

Total

2

52

52+3*

2**

30

130

108+3*

1284.02

*GWL-Goods, JHS (EI-1)&JHS (EI-2)**ICL &BSZ

Standard of Interlocking

Route

STD-III/IIR

[speed>50 kmph]

STD-I

[speed<=50 kmph]

MNI

[speed<=15 kmph]

TALQ with LF [Only in NG]

Total

A Route

35

01

 0

-

36

DRoute

24

-

0

-

24

D Spl Route

34

34

E Route

13

01

0

14

Total

106

2

 0

-

108

SIGNALLING

“A” ROUTE

Bina(excl)-Dholpur (excl):-

This section has 36 stations,28 IBH ,24 Traffic interlocked LC gates& 20Engg. Interlocked LC  

Gates .

InterlockingAll stations are Std.III except Jhansi RRIwhich is interlocked withStd I.

Signaling:-23 stations are provided with Panel interlocking (Siemens make), 02 station are provided with RRI&13 Station areprovided with Electronic interlocking(BJA,DWA,JHA,KHJ,BJI,BAB,CIRL,DBA,AEH,BLNR,RRU,BAO,SIKD). GWL Goods ,JHS EI-1 & JHS EI-II is in addition to these 9 EI’s.Jhansi RRI is consist of 412 Routes& that of Gwalior RRI 326 Routes.

Block Working:-JHS-BINAsection is provided with UFSBI (19 block sections) with Dual detection for BPAC.JHS–DHO section is provided with SGE block Instruments (15Block section)& UFSBI (AEH-DBA,AEH-ARI,BAO-RRU ,03 Block instruments) with Block Proving by Axle Counter( . Gwalior-Birlanagar sectionis continuously track circuited).

IBS:-Intermediate block signaling(IBH) has been provided in 28 block sections.

SECTION

TOTAL IB

IB WITH SINGLE DETECTION

IB WITH DUAL DETECTION

BIN – JHS

15

0

15

JHS- DHO

13

9

4

“D” ROUTE

1- Khairar(Ex) –Bhimsen(Excl)

This section has 09 stations ,11 Traffic interlocked LC gates& 04 Engg. Interlocked LC Gates.

Signaling:-KID-BZMsection is provided with MACLS signaling. 03 station are provided with EI (Ghatampur,Patara,Katara Road,), 04 Stations are provided with PI Std-II R (namely Yamunasouthbank, Ragaul, Akona, Hamirpur). 02  stations are provided with MACLS Std-II with end cabins(Bharuasumerpur, &Ichauli )

Block Working:-Absolute block working with DiadoTokenless Block Instrument (ICL-AKW-RGU-BSZ-JSB-HAR)with Dual Detection & UFSBI Block Panel (KID-ICL,HAR-GTM-PTRE-KTRR-BZM) are provided with dual detection.

2- Jhansi – Khairar (excl)

This section has 13 stations ,12 Traffic interlocked LC gates& 05 Engg. Interlocked LC Gates.

Signaling:-7 stations are provided with panel interlocking (Mahoba, Kabrai, Mataundh, Orcha, Baruasagar, Niwari&Teharka) and 6 stations  are provided with Electronic interlocking (Belatal, Kulpahar, Mauranipur, Rora, Harpalpur, Ranipur Road). All stations in this section are provided with dual detection in yard.

Block Working:- Absolute block working on block panel with UFSBI/SSBPAC in 14 block sections provided with dual detection.

3-Mahoba(Ex) – Khajuraho:

This section has 02 stations ,01 Traffic interlocked LC gates& No Engg. Interlocked LC Gates

Signaling :-02 Stations are provided with Panel interlocking at Khajuraho &Singhpurdumra with    Std.II Interlocking .

Block Working:- Absolute block working with block panel UFSBI with BPAC dual detection.

“D” Spl ROUTE

1-Jhansi(Ex) – Kanpur

This section has 22 stations ,23Traffic interlocked LC gates&20Engg. Interlocked LC Gates.

Interlocking:-All stations are provided with Std -III.

Signaling:-04 stations (KPI,LLR,PMN,BZM) are provided with panel interlocking 18 Station are provided with Electronic interlocking.

Block Working:-Absolute block working with Diado Token less Block Instrument in 04 section & Universal fail safe block interface (UFSBI) working in 18 sections.(BZM-JUHI having SGE block instrument with dual detection)

IBS:- Intermediate block signaling (IBH) has been provided in01block sections.

SECTION

TOTAL IB

IB WITH SINGLE DETECTION

IB WITH DUAL DETECTION

JHS-CNB

01

00

01

2-Khairar – Manikpur (excl):

This section has 12 stations ,08 Traffic interlocked LC gates& No Engg. Interlocked LC Gates

Signaling :-05 stations are provided with panel interlocking (Chitrakut, Shivrampur, Badausa, Dingwai&Khoh) with Std-II-R. and 07 stations having EI (Atarra, Khairar, Khurand, Banda,  Bharatkup, Bahilpurva,Ohan Station with Std- IIIR. Out of 7 station EI ,03 EI stations are provided with dual detection in yard (Bharatkup, Bahilpurva and Ohan).

Block Working:- Complete section provided with Block panel with UFSBI/SSPBAC with BPACprovided with dual detection.

“E” ROUTE-

1-Lalitpur(Ex)- Khajuraho(excl);

This section has 08stations ,No Traffic interlocked LC gates& No Engg. Interlocked LC Gates

Signaling :-Total 08 stations are provided with panel interlocking with Std – II R (BRRI-DUYG)

Block Working:-04 block-section (Lalitpur-Birari,Birari-UdaypuraUdaipura,-Tikamgarh, Tikamgarh –Sarkanpur) provided UFSBI with HASSDAC. 05 nos block section from Sarkanpur to Khajuraho  are provided with Diado block instrument with BPAC( With dual detection).

 

2-Birlanagar–Bhind

This section has 05 stations ,03 Traffic interlocked LC gates& No Engg. Interlocked LC Gates

SIgnalling:-Thissectionis equipped with MACLS Five station Malanpur(MLAR),Sanichara(SAC),BHIND(BIX),Gohad(GOA), SONI EI with standard IIIR(With block working of UFSBI & Dual  detection in  (SAC-MLAR-GOA-SONI,BLNR-SAC-MLNR,SONI-BIX-UDI).

3-AIT- Konch section- Konch station is provided with PI (MACLS).One train only system.

“NG” ROUTE

1-Gwalior NG sectionsLQ two aspect signalling. All stations are NI.

TELECOMMUNICATIONS

2.1     Control Working:

Bina-Jhansi-Dholpur

Control working on OFC. Block working on RE (Spare in few sections) Cable, 6 Quad & OFC cable.

Jhansi-Kanpur

Control working on OFC. Block working on, 6 Quad/OFC

Banda-Bhimsen

Control working on OFC. Block working on 6Q cable/OFC

Banda- Manikpur

Control working on OFC. Block working on 6Q cable/OFC

Jhansi-Banda

Control working on OFC. Block working on 6Q cable/OFC.

Gwalior-Etawah

Control working on OFC. Block working on 6Q cable/OFC

Mahoba-Khajuraho

control working on OFC .Block working on OFC .

Lalitpur-Khajuraho

Control working on OFC and 4 Station block working on 6 quad cable/OFC& 5 Station block working on 6Q only.

2.2 VHF Sets: All Block stations on the division including branch lines, narrow gauge and ‘E’ route have been provided with high power 25 W VHF sets

5W VHF setsTotal2265nos,Old VHF set =365 (Make – Motorola GP 328- 75 nos., HYT 700-247nos., HYT 270- 43 nos,)& New VHF Set (Sanchar STC 700-1900 nos.)  5W VHFSet are distributed to various departments for train movement operation.

2.3OFC- OFCExists on all routes of JHS division except NG which will be provided with gauge conversion. Long haul circuits & connectivity of various   exchanges on the route has been done on OFC. all of the UTS/PRS & FOIS have been also transferred on OFC.

2.4 RAILNET-There are 1032 nodes of Railnet connected on LAN &479 nodes are provided at different locations of division on DSLAM.

2.5FOIS– There are total 68 nodes available in JHS division 47 at JHS & 1 each at Morena, Diamond cement, Paricha thermal power plant, Banda, Gwalior, Rayaru, Datia, Karari, Lalitpur, Orai, Mahoba,Khajurao,Malanpur, Kabrai, Bhimsen, Jhansi W/Bridge, Dabra, Harpalpur, RPGU(HPTR), UDPR(LPGU) and Niwari.

2.6BSNL TelephonesBSNL phoneshave beenprovided at 45 stations out of 121.

2.7CUG Connections - Total 6212 CUG connections are provided to various departments on the division.

2.8MTRC-MTRC systemis provided on Dholpur-Jhansi section consisting of 17 BTS stations. Total 321/321 Sets/SIMs are distributed to passenger trains LP &Guard.

2.9 Passenger Amenities:

              Following passenger amenities are provided on the division:

SN

Amenity

Total Locations

Route-wise break-up

A

D

E

NG

1

PRS

28

6

4

-

Non-Railway Head =09Nos

Postal PRS = 09no’s

2

PRS Fare Repeater

56

11

23

4

Non-Railway Head =09Nos

Postal PRS = 09no’s

3

UTS

104

34

53

17

4

UTS Fare Repeaters

104

34

53

17

5

UTS cum PRS

28

6

19

3

6

PC based Announcement System

16

8

8

-

GWL, JHS, LAR, BNDA, CKTD, DBA, DAA, BAB, OR, MRA, MBA. ATE, SWC,BLNR, KLAR, KURJ

7

Manual Announcement System

92

27

59

6

8

PC Based LED type TTDB

9

6

3

-

JHS, GWL, MRA, LAR, OR, DBA, KURJ,MBA.,DAA

9

PC based Coach Guidance System

11

6

5

-

JHS, GWL, MRA, LAR,  BNDA, OR,CKTD,KURJ,MBA.DBA.DAA

10

CCTV

9

6

3

-

JHS, GWL, MRA, BNDA, LAR, OR, BAB, DAA, MBA

11

Wi-Fi

107

34

63

10

Achievement during 2021-22 in Jhansi Division

SIGNALLING:- New Work

1.Completion of 52.7 KMs doubling work in JHS-CNB Section & 3rd line commissioning of 25.35 KMs in JHS-BINA Section which has enhanced the line capacity, improved punctuality & mobility.

2.Completion of Railway Electrification work of total 224.01 KMs (BLNR-UDMR, MBA-KURJ,KURJ-ISHN) in current financial year.

3.Fifteen Stations commissioned with Electronic interlocking over the division {(BABINA-28.06.21, PTRE-30.07.21, GOA-31.07.21, SONI-12.09.21, KTRR-12.09.21, CNH, PHN, MLS-28.09.21, MOTH, ERC-22.12.21, AEH-31.12.2021, BJA-04.03.2022, DWA-14.03.2022, JHA-25.03.2022 (BLNR, RRU-25.03.2022)}.

4.04 Electro Mechanical STN (PTRE, GOA, SONI, KTRR) replaced with EI for centralized operation.

5.Replacement of 04 electromechanical signaling system at JHS GC-1,2,3 & F-cabinby more reliable EI signaling system JHS-EI-II.

6.GOA, SONI, PTRE & KTRR station converted fromstd. I to Std. III R.

7.With the commissioning of EI at SONI station, entire JHS division is now free from Token Block Instruments.

8.Entire A Route of JHS division has been free from Electro-Mechanical interlocking system with the commissioning of JHS EI-II.

9.Five Nos. of Interlocked LC gates closed after modification in the existing circuit (LC-156,324,330,346,366).

10.EI Alternation in existing 03 Nos. of EI (NDK, PRN & JHS EI-I) & Major alteration work in JHS RRI.

11.Major Alternation work has been done at GWL RRI in connection with 3rdLine work.

12.Fifteen Pairs of Daido Block Instrument replaced with UFSBI.

13.Dual Detection provided in 15 block sections and 4 Station Yards (SONI, GOA, OR, AEH).

14.Automatic Fire Detection system provided at 16 stations.

15.Provision of Earth Leakage Detector 100 Nos. at different stations & networked through data-logger for on-line monitoring of the signaling cables health.

16.Conversion of DLA station has been done into Intermediate block hut (IBH).

17.Conversion of UP loop line into common loop line by insertion of emergency crossover at JHS end in connection with 3rdline workat DWA station.

18.The CSR of DN Loop line at AEH station has been increased from 696 meters to 736 meters.

19.Provision of E-1 connectivity for strengthening of Data Logger network for better monitoring.

20.01 Neal’s Ball Token Block Instrument replaced with block panel (UFSBI-Webfill) in GOA-SONI section.

21.Interlocking of 05 Nos. of non-interlocked gates (LC-199, 204, 212, 155, 158) has been done successfully.

TELECOM:- New Work

1.Provision of Coach & Train Indication Board with Auto Announcement System has been done at GWL, Orai&DAA,BNDA stations.

2.Provision of CCTV at 05 Nos. of stations (LAR, BAB, DAA, MBA, OR), Two Nos. of Offices (DRM & RPF Office) & Five Nos. of Heavy Traffic Engineering gates.

3.Provision of Rail net connectivity for e-Office at 11 Nos. of Main Line stations, Depots & Offices through DSLAM.

4.Secure Communication facility provided at 15 LC gates in JHS-CNB section.

5.08 Nos. of BSNL Channels surrendered during the year which has resulted into saving of Rs. 7,21,252/- per year.

6.60 Nos. of BSNL Telephones surrendered during the year which has resulted into a saving of Rs. 2,88,000/- per year.

7.Wiring of potential free contact for monitoring of OFC charger in entire JHS Division completed.

8.Wi-fi facility has been provided at all stations in Jhansi division.

Achievement during 2022-23 in Jhansi Division: -

1.Two Stations commissioned with electronic interlocking over the division in 2022-23 (BAO-08.04.22, DBA-17.06.22)

2.To enhance line capacity in BZM-GOY section, provision of IBH double line section is completed on 13.04.22.

3.Replacement of electromechanically SGE block working by Deltron make new UFSBI in GOY-BZM section.

4.Major alteration in LAR Siemens make PI in connection with 3rd line work completed on 08.04.22 in LAR-DWA section.




Source : North Central Railways / Indian Railways Portal CMS Team Last Reviewed : 28-06-2022  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.