Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

IR Personnel

News & Recruitment

Tenders & Notices

Vendor Information

Public Services

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS
Training Centres

ELECTRIC OPERATION BRANCH

NORTH CENTRAL RAILWAY JHANSI

विद्युत परिचालन शाखा

..रे., झांसी

 

For the financial Year-2012-2013

Annexure-I

Sl. No.

Item

Details

1

General

a) Name of the Training Institution

Basic Training Centre (Loco) Jhansi

b) Location of the Training institution

 (with map in A4 size as Annex.-1)

Steam Loco Shed Jhansi

c) Complete postal address with PIN Code

Basic Training Centre(Loco) Jhansi,C/O CCC Office,Steam Loco Shed Jhansi-284001

d) Details of ISO and other certifications

    obtained, if any

Nil

e) Telephone Number of the

    training institution

Railway

DOT/MTNL                              (with STD Code)

Fax

037-55428,55434

0510-2442225

f) Web site address of the Institution

Nil

g) Date of setting up

21.04.1992 as BTC(LOCO)Jhansi

h) Whether recognized by Railway Board (Tick appropriately)

Yes/No

i) Nominated Training Manager by Railway

   Board/Railway   (Name and Designation)

Sh.A.K.RAWAL/CEE/NCR

2

Details of the in-charge

i) Name

V.K.SHARMA

ii) Designation

Instructor

iii) Mobile number

9794847010

iv) Email address

v) Date (dd/mm/yy) of Joining Training Institution

13.07.2009

vi) Scale of Pay and Grade Pay

9300/- - 34800(GP-4600/)

3

a) Objectives of the training Institution 

To impart  training to all categories of  running staff (LP's, LP/Shtg., ALP's)

b) Broad category of staff being trained                                                                                                                                                   (Name five major categories only)

 

All categories of running staff.                                                                                                                 

Page-02

4

Infrastructure

a) Layout

i) Total area of the training institution (in Acres)

5000 sq. Feet (approx.)

ii) Total covered area (sq. meter)

iii) Total open area (sq. meter)

iv) Layout Plan

Nil -To be attached in A4 size as Annexure-II

v) Landscaping/Gardening (Tick appropriately)

Yes/No

vi) Power Supply availability

     (Tick appropriately)

a) Less than 10 hrs. in a day                                                             b) 10-12 hrs. in a day                                                                        c) 13-14 hrs. in a day                                                                         d) More than 18 hrs. in a day

vii) Availability of Generator back up / Power back up for

Office

Class rooms

Hostel

Mess

Yes / No

Yes / No

Not Avl.

Not Avl.

b) Class Rooms

i) Area  (sq. meter in ascending order) of class rooms

Class                                                                                                                           1) Room no.  1 is   94.87sq. meter                                                                                                           2) Room no.  2 is   93.50sq. meter

ii) Number of class

   rooms

1

2

iii) Capacity of each class room (in term of number of trainees)

21

36

iv) Average class room capacity

 28  (trainees in each class room)

C) Number of toilets near class rooms

Gents- 01 (Multiple Urinals & Lavatory)

Ladies-Nil

d) Hostel Accommodation

i) Room Details

Single Bed

Double Bed      (Sq. meter)

Triple Bed     (Sq. meter)

Dormitory     (4beds and above)                                   (Sq. meter)

Ladies         (Sq. meter)

ii) Average Area (sq. meter) of each room

Nil

Nil

Nil

Nil

Nil

Nil

iii) Number of rooms

Nil

Nil

Nil

Nil

Nil

Nil

iv) Details of toilets (if attaches)

Nil

Nil

Nil

Nil

Nil

Nil

v) If not attached No./Size of the toilets in hostels

Number

Area (Avg. size in sq. meter)

Nil

Nil

Page-03

e) Model Rooms

i) Number of

   Model Rooms

02

ii)Discribe layout of

  each (briefly)                                                                    

02 Loco  Model Room

iii) Average Area (sq. meter) of model rooms

92.18 sq. meter

iv) List of equipments in each Model Room                        (enclosed as Annexure-II)

f) Library Facilities

i) Available             (Tick appropriately)

Nil

If available

ii) Total number of Books Available

05

iii) Type of Books

Codes and Manuals

Technical

Railway Publications

Others

Numbers

2

3

Nil

Nil

iv) Number of Books in various Languages

English

Hindi

Regional Languages

Others

Number

2

3

Nil

Nil

v) Library Budget (annual, if any) Details

Nil

g) Computer Facilities

i) Number of rooms

Nil

ii) Average Area of each room (in sq. meter)

92.18Sq.Meter

iii) Number of Computers

N/A

iv) Type of Computer Courses

      being run  (Major 5 courses)

Nil

h) Medical Facilities

i) Name of Medical Centre:

Railway Hospital,Jhansi

ii) Whether in-Campus?

No

iii) If No, Distance from Training

    Centre (in Kms) if located in

    same town

Railway Hospital

Other Public/Private  Hospital

App.600 Meter

2 Km

i) Recreational Facilities

a) Indoor (please specify 5 major games)

Nil

b) Outdoor (please specify 3 major

    games)

Nil

c) Yoga / PT

Nil

d) If yes, please specify timing

    Morning / Evening

Page-04

j) Messing Facilities

i) Whether Available 

   (Tick appropriately)

Nil

If Available

i) Method of Running the Mess                      (Tick appropriately)

Departmentally

Self managed by trainees

By contract

 Any other                 (please specify)

k) Kitchen Facilities (Whether Available)

No

i) If available

  Area   (sq. meter)

Facility available                                    (please specify in separate                   Annexure-iv)

ii) Dinning Hall (Whether Available)

No

iii) If available

   Area                           (Sq. meter)

Seating Capacity                                  (in term of diners who can be served at the same time)

iv) Pantry Room

Nil

v) Dish washing Area

Nil

If yes, furnish details of washing area

a) Size in sq. meters

Nil

b) Type of Detergents / Chemicals

     being used

Nil

l) Other Facilities

Bank

ATM

Railway Station

Bus Stand

i) Available within campus

No

No

No

No

ii) If not available within campus, distance from the training institution

 (in Km.) in the city.

1.0 Km.

1.0 Km.

1.0 Km.

5.0 Km.

Page-05

5

Faculty

a) Detail of Gazetted faculty

Nil

b) Detail of Non-Gazetted faculty with their date of joining the training centre.

01

V.K.Sharma

(LPTM/Medically De-Categorized)

13.07.09

c) Grade-wise sanction and on-roll strength of trainers /instructors

SS

MOR

Vac

Remarks

02

(9300/-34800/)

GP-4600

01

(9300/-34800/)

GP-4600

01

Sanction of 02 Chief Loco Inspector but due to vacancies in CLI cadre Supernumarary post candidate utillizing

d) Training of Traoners (TOT) Course

i) Number of trainers who have done TOT course

Nil

ii) Number of trainers who have not done TOT course

1

e) Details of visiting faculty (5 Names to be given) who have given lecture in FY 12-13.

Name

Designation

Company / Organization

Date of visiting

Remarks if any

6

Detail of Disaster Management Training (if applicable)                                                         Not applicable

a) No. of programmes conducted-separate Annexure VIII,

    to be attached.

x

b) Average duration of each programme (in days)

x

c) Total number of trainees attended Disaster Management

    Programmes in FY 12-13.

x

Page-06

7

Training Aids

a) Over Head Projector

Available  (Yes)

If Available

Number

1

b) White Board

Available  (Yes)

Number

3

c) Flip Chart Board

Available  (No)

If Available

Number

Nil

d) TV / Projection Board

Available  (Yes)

If Available

Number

1

e) LCD Projector

Available  (Yes)

If Available

Number

1

f) VCR/DVD/CD Player

Available  (No)

If Available

Number

Nil

g) Video Camera/Digital Camera

Available  (No)

If Available

Number

Nil

h) Photocopying/(Resograph)

Available  (No)

If Available

Number

Nil

i) Digital Scanner

Available  (No)

If Available

Number

Nil

j) PC (other computer room)

Available  (No)

If Available

Number

Nil

k) Laptop

Available  (No)

If Available

Number

0

l) Printer

Available  (No)

If Available

Number

Nil

m) Other Photocopying Facilties (Gastetner)

Available  (No)

If Available

Number

Nil

n) Public Address Systems

Available  (Yes)

If Available

Number

1

o) Any other (please specify)

Page-07

8

Capacity Utilization

a) Planned Capacity

In terms of trainees seats

In terms of trainees days

Nil

Nil

b) Capacity Utilization (Including three previous financial year)

Year

In terms of trainees seat

In terms of trainees days

2012-13

8540

7896

2011-12

16800

761

2010-11

16688

704

2009-10

16744

575

c) Details of Trainees who have completed the training in FY 2012-13 (separate  Annexure IX to be attached giving Name designation, Name of course attended, No. of days of training)

d) Number of one day/two days crash training organized during the year  2012-13

1642

(One day Capsule Courses on Aoutomatic Competency/TPWS)

9

Budget Utilization

a) Name of Officer                Controlling the budget

Sr. DFM/JHS

b)Budget  (for the current year and the three preceding financial years)

Year

Allotment                                           (fig. in thousand)

Utilization                         (fig. in thousand)

2012-13

Nil

Nil

c) Works Programme (if any) in progress/sanctioned for the training institution

 A. Pink Book (List each work)