Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
खोज :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in English
National Emblem of India

हमारे बारे में

भारतीय रेलवे कार्मिक

समाचार एवं भर्ती

निविदाओं और अधिसूचनाएं

प्रदायक सूचना

जनता सेवा

हमसे संपर्क करें



 
Bookmark Mail this page Print this page
QUICK LINKS
याँत्रिक कैरेज व वैगन

MECHANICAL (CARRIAGE & WAGON)

1.The Mechanical department(C&W)/JHS is headed by a JAG/Selection grade Officer designated as Sr. DME/C&W. He is assisted by DME/C&W & CDO/JHS.

 

NG area at GWL alongwith B.G. coaching depot is looked after by CDO/GWL.

 

2.CARRIAGE AND WAGON DEPOT IN JHANSI DIVISION

Coaching Depot

There are 5 Broad Gauge Depots and one Narrow Gauge Depot in the Division, the details of which are as follows: -

Broad Gauge

Depot

Washing pits

Rake Holding

No. of rakes per day

No.

Capacity

Primary

Turn round attention

JHANSI

CNB SIDING

 

 

22

 

 

CNB-2

10 Coaches

1 Rakes

2 Rake

CNB-6

12 Coaches

2 Rakes

1 Rake

STEAM LOCO SHED

 

 

SLS-1

14 Coaches

2 Rakes

--

New washing line

26 coaches

2 Rakes

--

Platform

 

5 Rakes

GWALIOR

TAJ SIDING

 

 

 

14

 

 

New washing line

21 Coaches

2 Rakes

--

BKD SIDING

 

 

1

20 Coaches

3 Rakes

--

Platform

 

 

--

--

--

2 Rake

BNDA

--

--

--

--

--

BIX

--

--

--

--

3 Rakes

KURJ

--

24 Coaches

2

1 Rake

5 Rakes

Narrow Gauge

Depot

Washing pits

Rake holding

No. of rakes per day

No.

Capacity

Primary

Turn round attention

GWO

1

8 Coaches

5

3 Rakes

--

3.Train Maintained in Division

Primary Maintenance

Depot

Sr. No.

TRAIN NUMBER

EX

TO

TOTAL NO. OF RAKES

COACHES PER RAKE

TOTAL COACHES

 

 

 

 

 

 

 

 

 

 

 

 

 

JHS

1

51818/51817 51805/51806 51807/51808

51812/51811

JHS

JHS

JHS

JHS

KURJ

MKP

BNDA

BINA

4

11

44

2

51813/51814

51803/51802

51801/51804

JHS

JHS

CNB

LKO

CNB

MKP

4

10

40

3

51831/51832

51828

51830/51829

51827

JHS

JHS

ET

ET

AGC

ET

NGP

JHS

4

11

44

4

51822/51821

JHS

KURJ

1

5

5

5

51815/51816

JHS

AGC

1

10

10

6

11109/11110

JHS

LKO- MTC

2

12

24

7

11105/11106

JHS

KOA

1

15

15

8

11103/11104

JHS

BCT

1

22

22

9

51861/51862

51863/51864

51865/51866

51867/51868

51869/51870

AIT

KONCH

1

3

3

10

11801/11802

JHS

ETW

1

11

11

11

21801/21802

JHS

RTM

2

4

8

 

 

 

 

GWL

1

11123/11124

GWL

BJU

3

21

63

2

11107/11108

GWL

BSB

2

18

36

3

12175/12176

GWL

HWH

1

20

20

4

11125/11126

GWL

RTM

2

21

42

5

12197/12198

GWL

BPL

1

11

11

6

51882/51881

GWL

AGC

1

10

10

7

51883/51884

GWL

DMO

2

10

20

8

11101/11102

11111/11112

GWL

PA

BLP

1

16

16

9

51887/51888

GWL

BIX

1

10

10

KURJ

1

01841/01842

KURJ

KKDE

2

21

42

Turn round attention

DEPOT

Sr No

TRAIN NUMBER

EX

TO

COACHES IN RAKE

JHS

1

51832/51828

JHS

ET

10

2

51813/51814

JHS

LKO

10

3

12280/12279

JHS

NZM

20

4

51807/51808

JHS

BNDA

10

5

51805/51806

JHS

MKP

10

6

51812/51811

JHS

BINA

10

7

12049/12050

JHS

NZM

14

8

51821/51822

JHS

KURJ

05

GWL

1

59826/59823

59824/59825

GWL

BIX

10

2

22547/22548

GWL

ADI

20

 

KURJ

1

19665/19666

UDZ

KURJ

20

2

51822/51821

JHS

KURJ

05

3

51801/51802

KURJ

CNB

12

4

22163/22164

BPL

KURJ

14

5

51818/51817

JHS

KURJ

10

BIX

1

21126/25

BIX

RTM

20

2

59822/21

BIX

KOTA

10

3

51887/88

BIX

GWL

10

4.Cleaning contracts running in Jhansi division

Depot

Contract

JHS

Mechanized coach cleaning & Turn round attention

Clean train station

On board housekeeping services (Recently Suspended)

GWL

Mechanized coach cleaning & Turn round attention

On board housekeeping services (Recently Suspended)

KURJ

Mechanized coach cleaning & Turn round attention

 

5.MECHANIZED LAUNDRY AT GWL

 

To provide washed and good quality linen to passenger, a mechanized laundry capacity 1 ton per shift has been started from 03.11.2016 at Gwalior. All trains originating from GWL are covered.Presently due to COVID’19, it is lying closed.

6.Division holding of coaches

Broad Gauge

Sr. No.

 

LW/FACCN

LW/FAC

LW/ACCZ

LW/ACCW

LW/ACCN

LW/ACCNW

LW/GSCN

LWS/GS/CZ

LWLRRM/ SLR

TOTAL

1

Bare Req.(ICF)

2

4

4

10

28

2

89

251

70

460

Bare Req.(LHB)

0

0

0

2

5

0

16

9

4

36

Total Bare Req.

2

4

4

12

31

2

105

260

74

496

2

Total Spare

1

1

1

2

5

1

15

32

9

67

3

Total Req.

3

5

5

14

36

3

120

292

85

563

4

Availability

3

2

9

13

39

1

116

226

59

468

5.

Shortage

0

- 3

+4

-1

+3

-2

-4

-66

-26

- 95

Narrow Gauge (GWO)

GSCZ

GSCZLR

SCZ

SCZR

GSCWR

S

RA

CD

GS

RD

TOTAL

32

5

4

3

1

1

1

1

4

1

53

Presently narrow gauge train service is suspended.

7.FREIGHT DEPOTS

 

There is only one Freight Depot in the Division at Jhansi

 

Activities:The following activities are done at Sick Line, Jhansi

 

  1. ROH of wagon (Defence wagon, Departmental, BCN etc.)
  2. Premium and Intensive examination,
  3. Light repair & heavy repair works on wagons.
  4. Local Manufacturing of items in Ancillary shop/Machine shop and blacksmith shop

 

DEPOT

ROH Target

JHANSI

75 Wagons Air braked stock/month

 

8.DEFENCE YARD

 

There are 02 Defence yards in JHS Division. Mainly dealing in military stock & VP movement

a.JHANSI DEFENCE YARD

b.BAB DEFENCE YARD

JHANSI DEFENCE YARD

The holding of freight and coaching stock as on 06.02.2019 are as under:-

Stock

Holding

Freight

·MBWT

273

·DBKM

22

·BRS

35

·BFAT

157

·MRG

01

·BVZC/ZI

05

Total

493

Coaching

·AC

14

·MSGCN

02

·ML

01

Total

17

 

BAB DEFENCE YARD

 

The holding of freight and coaching stock is as under: -

Stock

Holding

Freight

·MBWT

139

·DBKM

121

·BRS

17

·BFAT

95

·MRG

07

·BCN

06

·BVZC/ZI

06

Total

391

Coaching

·AC

09

·MSGCN

02

·ML

01

Total

12

 

9.IMPORTANT HIGHLIGTS/ACHIVEEMTNS

 

1.

Quick Watering system

ØThe work of Quick Watering System has been completed at Jhansi.

Ø3600 meter pipe line of 200mm dia laid down on platform from 1 to 8 Nos. except 7.

ØRate of water flow is 150 Liter/minute instead of 70 liter/minute

ØIn this system SCADA, VFD and HMI provided.

ØThis will monitor the water and electric consumption.

ØFor ensuring uninterrupted power supply one 500 KVA DG set provided.

Ø03 Nos., 125 KVA motors with pump have been provided for continuous high pressure water supply.

ØSMS based pump operation provided.

 

The view of Control RoomThe view of Main Header

 

The view of DG & Control PanelThe view of pipe line laid

2.

Hot Axle Hot Wheel (HAHW) Detector

 

ØHot Axle Hot Wheel detector installed near ‘F’ cabin, Jhansi on up route.

ØAny value deviating from the norms, trigger alarms via SMS to preferred mobile Nos. at control Office and train passing supervisors for potential actions to safety.

ØTotal 162004vehicles passed on this system.

Ø92 cases have been reported. 61% cases were reported confirmed and 39% cases were not confirmed.

Ø03 cases of hot axle were reported. Wagons were detached at Jhansi.