1.         GENERAL INTRODUCTION –

1.1       GAZZETTED OFFICERS - Sr. DEE/G/JHS and ADEE/G/JHS.

1.2       Staff Non-gazzetted.

S.N.

Category

OSM group

TL/AC group

S/S

O/R

S/S

O/R

1

Supervisors

24

21

14

11

2

Skilled

109

80

136

76

3

Un-skilled

188

128

95

91

Total

321

229

245

178

1.3       Electrified Station:

Electrified/Non-electrified

Main line

Branch line

NG line

Total

Electrified stations

36

84

17

137

Non-electrified stations

02

14

10

26

Total no of stations

38

98

27

163

           

1.4       Power Supply System:

Sub-stations

46

Transformers

127

Stationary DG sets

26

5 KVA DG sets

51

1.5       Staff Quarters:

Electrified staff quarters

4722

1.6       Electrical Pumps:

S. N.

Type of pump

Qty

1

Vertical turbine pumps

04

2

Submersible pumps

286

3

Centrifugal pumps

24

4

Mono block pumps

83

5

Jet pumps

02

6

Sewage pump

07

Total

406

1.7       Water Coolers:

S. N.

Water coolers

Qty

1

On platform

110

2

Offices & Others places

100

Total

210

1.8       Maintenance depots:

Major maintenance depots for OSM

06 JHS (East, West, Diesel Shed), GWL, ORAI, BNDA

Minor maintenance depots for OSM

04 (LAR, JUHI, CKTD & KURJ)

Major maintenance depots for TL-AC

02 (JHS & GWL)

Minor maintenance depots for TL-AC

02 (BNDA & KURJ)

1.9       Train lighting & Air conditioning assets:

Rakes for Primary maintenance

43(BG/38 & NG/05)

TL coaches    

396 (JHS/212, KURJ/38 & GWL/146)

AC coaches

67(JHS/20, KURJ/08 & GWL/39)

Power Cars

05 (GWL)

Battery charging sets

29 (JHS/13, KURJ/3, BNDA/01, GWL/ BG-11 & NG/01)

Pre-cooling points

256 (JHS/132, BAB/12, KURJ/20 & GWL/(92)

2.         Lifts and Escalators:

2.1       Existing Escalator over Jhansi Division

SN

Station

Location

Qty

Present status

1

JHS

PF No. 1 CSMT end

1

Escalator installed on 18.01.2018

PF No. 1 CSMT end

1

Escalator installed on 07.06.2015

PF No. 2/3 CSMT end

1

Escalator installed on 07.06.2015

2

GWL

PF No. 1 NDLS end

1

Escalator installed on 25.12.2017

PF No. 2/3 NDLS end

1

Escalator installed on 12.12.2017

2.2       Future Planning of Escalator over Jhansi Division

SN

Station

Location

Qty

Status of civil work

Status of Electrical

work

TDC

1

JHS

PF No. 1 NDLS end

1

Letter has been written to Sr.DEN (Co)/JHS for executing the civil part of work, but work not started yet.

PO issued on 14.11.2019 to M/S Johnson Lifts Pvt. Ltd. Chennai.

04 nos. to be commissioned on new FOB which is to be constructed by Dy. CE/Bridge line/JHS

Structural drawing handed over to JLPL on 01/02/2021 for making GAD

PF No. 1 NDLS end

1

PF No. 2/3 NDLS end

1

PF No. 4/5 NDLS end

1

2

LAR

PF No. 1& 2/3

2

GAD of LAR escalator has been approved on dated 07.12.2020.

3

GWL

PF No. 1

2

2.3.      Existing lift over Jhansi Division

SN

Station

Location

Qty

Status of civil work

Status of Electrical work

TDC

1

Jhansi

PF No. 1

1

Completed

Lift installed on 18.01.2019

Completed

PF No. 2/3

1

Cladding work is in progress

Installed

Under commissioning

PF No. 4/5

1

Not started yet

Not started yet

2

Gwalior

PF No. 1

1

Completed

Lift installed on 17.07.2020

Completed

PF No. 2/3

1

Completed

Lift installed on 06.01.2020

Completed

PF No. 4/5

1

Completed

Lift installed on 06.12.2019

Completed

2.4       Future Planning of lift over Jhansi Division

SN

Station

Location

Qty

Status of civil work

Status of Electrical work

TDC

3

BNDA

PF No. 1

1

Estimate has been vetted and was forwarded for sanction on IRPSM but the proposal has been returned back as per of letter no. 2020/FX-II/BW/3 dated 28.07.2020 to keep the work in abeyance & sent again to HQ through IRPSM on 08/02/2021 for sanction of GM.

NA

PF No. 2

1

4

MBA

PF No. 1

1

PF No. 2

1

5

ORAI

PF No. 1

1

PF No. 2

1

6

KURJ

PF No. 1

1

PF No. 2

1

7

DAA

PF No. 1

1

                

3.              Innovations and System improvement (period Apr/20-Jan/21):

  

1.LED Façade lighting arrangement has been provided at GWL station.

2.LOA for LED Façade lighting at Jhansi railway station building has been awarded to M/s Vin Semiconductors, Mumbai. Work is held up due to renovation work of Jhansi railway station building.

3.LOA for 12 nos. National Flag at BNDA, CKTD, MCSC, DAA, LAR, MRA, BIX, MBA, SOE, TKMG, HAR & KURJ has been issued to M/s Bajaj Electricals Ltd, Mumbai on dated 10.08.2020. Flag Mast Foundation work is in progress and other material is being manufactured at Pune.

4.In order to provide Lighting on both sides of LC gates, the department has awarded tender no. JHS-ELG-W-T-10-20-21 for providing Solar light on both side of the LC gate to M/s Vertex, Delhi on 29.10.2020.




Source : CMS Team Last Reviewed on: 25-02-2021  


  प्रशासनिक लॉगिन | साईट मैप | हमसे संपर्क करें | आरटीआई | अस्वीकरण | नियम एवं शर्तें | गोपनीयता नीति Valid CSS! Valid XHTML 1.0 Strict

© 2010  सभी अधिकार सुरक्षित

यह भारतीय रेल के पोर्टल, एक के लिए एक एकल खिड़की सूचना और सेवाओं के लिए उपयोग की जा रही विभिन्न भारतीय रेल संस्थाओं द्वारा प्रदान के उद्देश्य से विकसित की है. इस पोर्टल में सामग्री विभिन्न भारतीय रेल संस्थाओं और विभागों क्रिस, रेल मंत्रालय, भारत सरकार द्वारा बनाए रखा का एक सहयोगात्मक प्रयास का परिणाम है.