ØDevelopment of HV testing facility to arrest the failure of VCB insulator bursting on line. ØNew integrated test bench for testing of both Bombardier & AAL make SMGRs. ØTest Bench for Focus Adjustment of Twin Beam Headlight. ØJig developed to fit the bearing on rotor shaft so that uniform pressure on inner & outer racer of bearing is ensured. ØFixture has been developed by shed on own effort for assembly and dis-assembly of brake cylinder. This has reduced the efforts in doing overhauling work. ØStand cum - trolley for handling DJ has been developed by shed to carry DJ from loco to shop floor and vice- versa. A wheel with latching arrangement has been provided to hold DJ in desired position during overhauling. ØReplacement of unreliable Old version -1 M/s Saitronik make VCD by version -5 VCD has been completed in all 28 locos. ØM/s Medha make MPCS Ver. 3 has been commissioned on 24 Loco (10 WAG-5 + 12 WAG-7, 02 WAP-4)by in house efforts of ELS/JHS. This will enable, the remote outline monitoring of Loco parameters. ØA fixture has been developed for run test of SIV cooling fan of Siemens, Hirect and Autometer (AAL) make after its overhauling. This will improve performance reliability ofSIV cooling fan. ØCommissioning of Microprocessor based Digital Automatic KARL FISCHER Titration Apparatus (COULOMETRIC TYPE) for testing of moisture content in insulating oil of Loco main transformer (TFP) & Tap changer (GR) has been done. ØPROCUREMENTOF BORESCOPEENABLE TO Wi - Fi: Maintenance of parts at critical locations which are not visible can be inspected with the help of Bore – Scope enable to Wi-Fi and snap out images at smart mobile phone as well as laptop. ØPortable off line centrifuge oil cleaning machine, Cap. 5000 Liter/Hour has been commissioned on 18.06.19 for centrifuging of TFP Oil, for removing Moisture , Dissolved gas from TFP Oil and BVD will be increased. ØCommissioning of Ultrasonic testing machine (UFD Digiscan DS 333) of M/s EECI make has been commissioned on 28.06.19 for flaw detection in Axles, Armaturesshaft and Equalizing Beam to avoid on line failures. ØTest Zig to ensure paralleling of Brake hangers of WAG-5 & 7 locos has been prepared in-house. It will help to improve the braking system of the loco during overhauling. ØEmergency Fire Safety Action plan has been prepared. Total 49 Nos DCP type & CO-2 type Fire Extinguisher placed at various location of ELS/JHS. Ø20 Nos Fire Extinguisher Ball installed in critical locations invarioussectionsofELS/JHStoenhance Fire Safetymeasures. Fire Extinguisher Ball iscapable to extinguish Fire at initial stage&therefore minimizes the damagesand increases safety. ØSuccessfully replacement of Inner Short Equalizing beam Loco 23707(AJJ)on line : ( Loco was MU 23707+23918)
On 12.11.19, reported “ inner Equalizing beam”of Loco no. 23707/AJJ, broken & resting on Axle Box in AGC Divn. at Hardua Ganj Same has been replaced first time on line by ELS/JHS staff. It is an arduous task but ELS/Staff has skillfully replaced it on line. ØMock Drill for Wheel Lifting in Electric Loco in WAG-7, WAG-5 & WAP-4 was conducted at ELS/JHS on date 18.12.19& 19.12.19. ØEducational Video of wheel lifting of WAP-4 Loco An Educational Video of wheel lifting of WAP-4 Loco was made to educate the staff. This Video was very useful for better understanding of the procedure of Wheel lifting as done during Brake Down. ØUMIDRegistration Camp : Umid Registration of all 575 staff has been completed. ØProjectSaksham Training Phase – II : ProjectSaksham Training has been completed of all 589 staff.
o"kZHkj jktHkk"kk esa mRd`’V ,oa ljkguh; dk;Z ds fy, 'ksM] dh jktHkk"kk dk;kZUo;u lfefr dkseaMy jsy izca/kd }kjk py oStarh ’khYM+ ,oa :- 1000 dk iqjLdkj fn;k x;kA
|